The Full Wiki

Bangkok Metro: Wikis

  
  

Note: Many of our articles have direct quotes from sources you can cite, within the Wikipedia article! This article doesn't yet, but we're working on it! See more info or our list of citable articles.

Encyclopedia

Updated live from Wikipedia, last check: May 29, 2012 20:14 UTC (44 seconds ago)
(Redirected to MRT (Bangkok) article)

From Wikipedia, the free encyclopedia

Mass Rapid Transit (MRT)
MRT logo.png
Info
Owner Mass Rapid Transit Authority of Thailand
Locale Bangkok, Thailand
Transit type Rapid transit
Number of lines 1
Number of stations 18
Daily ridership Over 200,000
Operation
Began operation 3 July 2004
Operator(s) Bangkok Metro PCL
Number of vehicles 19 three-car Siemens Modular Metro
Technical
System length 20 km (12.43 mi)
Route map
Legend
Unknown route-map component "utINT"
Bang Sue
Urban tunnel station on track
Kamphaeng Phet
Unknown route-map component "utINT"
Chatuchak Park
Urban tunnel station on track
Phahon Yothin
Urban tunnel station on track
Lat Phrao
Urban tunnel station on track
Ratchadaphisek
Urban tunnel station on track
Sutthisan
Urban tunnel station on track
Huai Khwang
Unknown route-map component "utABZld" Unknown route-map component "utKDSTr"
Depot
Urban tunnel station on track
Thailand Cultural Centre
Urban tunnel station on track
Phra Ram 9
Urban tunnel station on track
Phetchaburi
Unknown route-map component "utINT"
Sukhumvit
Urban tunnel station on track
Queen Sirikit Center
Urban tunnel station on track
Khlong Toei
Urban tunnel station on track
Lumphini
Unknown route-map component "utINT"
Si Lom
Urban tunnel station on track
Sam Yan
Urban tunnel station on track
Hua Lamphong

The MRT (Mass Rapid Transit), sometimes referred to as the Bangkok Metro, is Bangkok's underground metro system. It was constructed under a concession concept. Most civil infrastructure were provided by the government sector, Mass Rapid Transit Authority of Thailand (MRTA) and handed over to their concessionaire under a 25-year concession agreement. Bangkok Metro Company Limited (BMCL) is the only private sector company that won a bid in MRTA's concession contract for the blue line. As MRTA's concessionaire, BMCL provides M&E equipment, including electrical trains, signalling systems, SCADA, communication, PSD, etc for the subway project and fully operates the system. To maintain the system, BMCL has subcontracted in 10 years to Siemens which was the M&E system supplier since system opeing and 7 years maintenance contract to two local maintenance services for north and south line. The MRT line is officially known in Thai as rotfaifah mahanakhon (รถไฟฟ้ามหานคร) or "metropolitan electric train", but it is more commonly called rotfai taidin (รถไฟใต้ดิน), literally, "underground train". The metro has a fleet of 19 trains; the 19th train entered service in October, 2007 after a major accident.

Besides the MRT, Bangkok also has an elevated rail system called BTS or informally the Skytrain.

Contents

History

Platform screen door at all stations
Inside of the Train

The construction of the first Bangkok Metro line, officially known as Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) – "Celebration of Royal Auspice" – or informally as the "Blue Line", began on 19 November 1996. The project suffered multiple delays not only because of the 1997 economic crisis, but also due to challenging civil engineering works of constructing massive underground structures deep in the water-logged soil upon which the city is built.

The Blue Line was opened for a limited public trial period of several weeks starting on 13 April 2004. On 3 July 2004 the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit, who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after the initial rush ridership has settled down to around 180,000 riders daily — considerably lower than projections of over 400,000, despite fares being slashed in half from 12-38 baht to 10-15 baht per trip. From 2006 until 2008, fares ranged between 14-36 baht per trip. The fare was raised to 16-41 Baht on 1 January 2009.

Operation

The entrance to Huai Khwang station

The 21-kilometer, 18-station Blue line presently runs from Bang Sue to Hua Lamphong via Phra Ram 9 and has a carrying capacity of 40,000 people in each direction per hour. Similar to the Skytrain, the Metro uses trains supplied by Siemens which travel up to 80 km/h. Passengers can conveniently connect to the Skytrain at Si Lom, Sukhumvit and Chatuchak Park stations. The metro has a large depot in Huai Khwang district, which is located between Phra Ram 9 and Thailand Cultural Centre stations. Considering that Bangkok is a low-lying plain which is prone to flooding, all of the Metro's station entrances are raised about one metre above the ground level and are equipped with built-in floodgates in order to avoid water inundating the system. Lifts and ramps are found at all stations, providing easy access for passengers in wheelchairs. Stations have multiple passage ways (generally four) which allow passengers to connect to any corner of the adjacent surface intersection. Maps depicting the local area and exit points are posted on the walls on the way out. Due to safety considerations, platform screen doors are installed. Uniformed security personnel and security cameras are present at each and every platform.

19 three-car metro trains, of the Siemens Modular Metro type, are used. Each metro train consists of two motor cars and a centre trailer car.[1]

The ticketing system uses RFID contactless technology with round black tokens issued for single trips and contactless stored value cards for frequent travellers. In the near future, a joint ticketing system will be set up so that passengers can use a single ticket on the Metro as well as on the Skytrain. Multi-storey park & ride facilities are provided at Lat Phrao and Thailand Cultural Centre. Motorists who park their cars at these premises will be issued with additional contactless smartcards and they need to have them electronically stamped at their destination station.

Major accident record

Entrance to Silom Station (Interchange with BTS Sala Daeng Station)

On 17 January 2005, just after 09:15, an empty train returning to the depot collided with a peak-hour train filled with passengers at the Thailand Cultural Centre station. 140 people were hurt, most of whom sustained only minor injuries, and the entire Metro network was shut down for two weeks.

After initial investigations, it was found that the empty train had run into problems shortly before the accident, grinding to a halt on a curve leading to the depot. The driver applied its brake and was waiting to be towed to the maintenance centre close to Thailand Cultural Centre station.

A rescue train was attempting to connect to the stalled train when the driver was told to release the brake while coupling had not yet been successful. It was then that the empty train began to roll backwards at a speed of ten metres per second, before smashing into the other train, which was carrying passengers. Therefore, it was believed that the incident was caused by negligence due to insufficient training of operation staff.[2] This accident also resulted in two damaged trains with heavily damaged areas limited to the two leading cars. The colliding speed was suspected to be about 60 km/hrs due to the appearance of damaged areas. However, one train, which was rebuilt from the repair of the minor-damaged cars, was already fitted for operation at the end of 2006 and the remaining one was still under heavy repair until mid of 2007; it was released into service in October, 2007. The cost resulting from the accident might be a much higher figure than BMCL quoted, and it was expected to be at least 400 million baht, which was totally insured by a local insurance company. The accident was recorded as the most severe damage ever in any metro system in Thailand.

The Metro resumed full operation on 1 February 2005, and passenger numbers soon rose back to pre-crash levels, partly due to a temporary promotional fare scheme which allowed passengers to travel any distance on the MRT for only ten baht (~0.25 USD).

Underground malls

Passageways between exits have been setup as malls and are steadily opening, creating underground cities. This is ironic since food and drink is not allowed in stations.

List of stations

Blue Line

Code Station Name Transfer coordinates
Blue Line
Tha Phra (Planned) BSicon TRAM.svgBangkok Metro Blue Line: Bang Khae Extension  (proposed)
Charan Sanit Wong 13
or Panit Thonburi
(Planned)
Yaek Fai Chai (Planned)
Bang Khun Non (Planned) BSicon TRAM.svg Bangkok Metro Orange Line  (proposed)
BSicon BUS.svg BMTA bus lines/taxi link to Taling Chan floating market
Bang Yi Khan
or Boromarajajonani
or Phra Pinklao
(Planned)
BSicon BUS.svg BMTA bus lines/taxi link to Southern Bus Terminal (Phuttha Monthon Sai 1)
Sirindhorn
or Krung Thonburi Bridge
(Planned)
BSicon TRAM.svg SRT Light Red Line  (proposed) (Taling Chan - Makkasan extension)
Bang Phlat (Planned)
Bang O (Planned) For Yanhee Hospital
Bang Pho (Planned)
Tao Pun BSicon TRAM.svg Bangkok Metro Purple Line  (proposed)
Under construction together with Purple Line Bang Yai - Bang Sue Project
18
BAN
Bang Sue Terminal station
BSicon TRAM.svg Bang Sue Junction Railway Station and Phahon Yothin Railway Station
BSicon TRAM.svg SRT Dark Red Line  (proposed)
BSicon TRAM.svg SRT Light Red Line  (proposed)
13°48′8.75″N 100°32′27.36″E / 13.8024306°N 100.5409333°E / 13.8024306; 100.5409333
17
KAM
Kamphaeng Phet For Chatuchak Weekend Market and MOF Farmers' Market 13°47′51.83″N 100°32′54.07″E / 13.7977306°N 100.5483528°E / 13.7977306; 100.5483528
16
CHA
Chatuchak Park BSicon TRAM.svg Sukhumvit Line: Mo Chit with outdoor Park & Ride lot
BSicon BUS.svg BMTA bus lines/taxi link to Northern and Northeastern Bus Terminal (Morchit 2)
For Chatuchak Park
13°48′9.85″N 100°33′13.21″E / 13.8027361°N 100.5536694°E / 13.8027361; 100.5536694
15
PHA
Phahon Yothin For Central Plaza Lat Phrao, Union Mall and St. John's University 13°48′46.25″N 100°33′41.22″E / 13.8128472°N 100.56145°E / 13.8128472; 100.56145
14
LAT
Lat Phrao BSicon TRAM.svg with Park & Ride facility and THAI's City Air Terminal with connections to Don Mueang International Airport (DMK) 13°48′23.21″N 100°34′22.54″E / 13.8064472°N 100.5729278°E / 13.8064472; 100.5729278
13
RAT
Ratchadaphisek For hotels and business offices along Ratchadaphisek Ring Road 13°47′56.58″N 100°34′28.37″E / 13.79905°N 100.5745472°E / 13.79905; 100.5745472
12
SUT
Sutthisan For Sutthisarn area (AKA Poor man Patpong) 13°47′24.12″N 100°34′27.02″E / 13.7900333°N 100.5741722°E / 13.7900333; 100.5741722
11
HUI
Huai Khwang For many massage and entertainment facilities, in Huai Khwang area 13°46′43.13″N 100°34′26.64″E / 13.7786472°N 100.5740667°E / 13.7786472; 100.5740667
10
CUL
Thailand Cultural Centre BSicon TRAM.svg Bangkok Metro Orange Line  (proposed) with Park & Ride facility

About a 20-minute walk to the performing-arts venue at Thailand Cultural Centre, Siam Niramit; for Jusco, Carrefour and Robinson department stores, as well as the Esplanade Cineplex

13°45′58.11″N 100°34′12.75″E / 13.7661417°N 100.5702083°E / 13.7661417; 100.5702083
9
RAM
Phra Ram 9 For Fortune Town shopping center and IT mall at Phra Ram 9 Intersection 13°45′26.57″N 100°33′54.56″E / 13.7573806°N 100.5651556°E / 13.7573806; 100.5651556
8
PET
Phetchaburi BSicon TRAM.svg Suvarnabhumi Airport Link: Bangkok City Air Terminal
BSicon TRAM.svg SRT Light Red Line  (proposed)

BSicon BOOT.svg Khlong Saen Saep Express Boat (Asok Pier)
For Srinakharinwirot University (Prasarnmit Campus)

13°44′56.90″N 100°33′48.20″E / 13.749139°N 100.563389°E / 13.749139; 100.563389
7
SUK
Sukhumvit BSicon TRAM.svg Sukhumvit Line: Asok
Nearby Siam Society and Sukhumvit shopping area
For Srinakharinwirot University (Prasarnmit Campus)
13°44′15.36″N 100°33′40.91″E / 13.7376°N 100.5613639°E / 13.7376; 100.5613639
6
SIR
Queen Sirikit National Convention Center For the Stock Exchange of Thailand, QSNCC and Klong Toei Market area 13°43′23.04″N 100°33′36.36″E / 13.7230667°N 100.5601°E / 13.7230667; 100.5601
5
KHO
Khlong Toei For Bon Kai - Klong Toei area 13°43′20.57″N 100°33′14.26″E / 13.7223806°N 100.5539611°E / 13.7223806; 100.5539611
4
LUM
Lumphini For Suan Lum Night Bazaar and Lumphini Park (Suan Lumphini) and dropping point to Sathon and Wireless Road 13°43′32.07″N 100°32′45.10″E / 13.725575°N 100.545861°E / 13.725575; 100.545861
3
SIL
Silom BSicon TRAM.svg Silom Line: Sala Daeng
For Lumphini Park, Chulalongkorn Hospital and Si Lom business area
13°43′45.44″N 100°32′15.21″E / 13.7292889°N 100.5375583°E / 13.7292889; 100.5375583
2
SAM
Sam Yan For Chulalongkorn University, Chamchuri Square edutainment complex center and Snake Farm of the Thai Red Cross 13°43′55.49″N 100°31′50.76″E / 13.7320806°N 100.5307667°E / 13.7320806; 100.5307667
1
HUA
Hua Lamphong Terminal station
BSicon TRAM.svg Hua Lamphong Railway Station, with trains in all directions.
BSicon TRAM.svg SRT Dark Red Line  (proposed)
13°44′14.17″N 100°31′4.05″E / 13.7372694°N 100.5177917°E / 13.7372694; 100.5177917
Wat Mangkon Kamalawat (Planned) For Yaowarat (Bangkok Chinatown)
Wang Burapha (Planned) BSicon TRAM.svgBangkok Metro Purple Line  (proposed)
For Wang Burapha and Phahurat shopping area
Sanam Chai
or Pak Khlong Talat
(Planned)
For Pak Khlong Talat flower market, Memorial Bridge (Saphan Phut Night Market), Wat Pho and Museum of Siam (National Discovery Museum)
Itsaraphap
or Bangkok Yai
(Planned)
For Wat Arun and Bangkok Yai Area
Tha Phra (Planned) BSicon TRAM.svgBangkok Metro Blue Line: Bang Sue-Tha Phra Extension  (proposed)
Bang Phai (Planned)
Bang Wa (Planned) BSicon TRAM.svgSilom Line: Bang Wa Extension  (proposed)
Phetkasem 48 (Planned)
Phasi Charoen (Planned)
Bang Khae (Planned) For Bang Khae Market area
Lak Song (Planned) Terminal at Kanchanaphisek Road (Western Bangkok Ring Road) with park & ride facilities

Expansion plans

Blue Line
Overview
System Bangkok Metro (MRT)
Status 18 stations built and extension of 21 stations is planned.
Locale Bangkok, Thailand
Termini Hua Lamphong
Bang Sue
Stations 18
Operation
Character Underground
Technical
Line length 21 km (13.05 mi)

Various expansion plans of the Metro have been proposed, as of 2010, construction work has been started on the MRT Purple Line. It is planned that, eventually, the combined route distance of the Metro alone will total 91 km with 3 Metro lines covering all of the major areas of Bangkok. The Blue line, once completely extended, will form a lariat-shaped loop encircling the city.

The initial expansion plan can be summarised as follows:

  • Blue Line extension:
  1. Bang SueBang Phlat – Tha Phra (13 km)
  2. Hua Lamphong – Tha Phra – Bang Khae (14 km)
  • Purple Line: Bang Yai – Sam Sen – Rat Burana (40 km)
  • (Phase 1: Bang Yai - Bang Sue construction underway and will be in operation in 2013 [3]
  • (Phase 2: Rama III Bridge - Klong Bang Pai construction underway and will be in operation in 2013)

[4]

  • (Phase 3: Depot at Bang Yai and four park-and-ride centres at the Nonthaburi, Ta-id, Samyek Bang Yai and Klong Bang Pai stations construction commencing)
  • (Phase 4: (last Phase) The fourth contract, worth Bt4 billion, has yet to be put up for bidding and involves installation of the rail system.

Other expansion plans for the metro include:

[Note] that these plans do not include the extension proposed for the Skytrain, SRT Lines and airport link which is under the control of State Railway Thailand. BMCL itself expects to be the operator for the extension project and other lines but the final decision is still dependent on MRTA (government sector).

As per the BMCL's annual report, earning of profit from operation is still far away and BMCL is still subsidized by main share holder which is CH Karnchange. An accumulated deficit from now is estimated between 1,000 and 1,500 Million Bahts. Nevertheless, the deficit is partially mitigated by initial public offering and the earning per share is still giving with no hope to public share holder from now.

See also

Bangkok Rapid Transit System
  BTS Sukhumvit Line
  BTS Silom Line
  MRT Blue Line
Airport Link
  MRT Purple Line (under construction)
  MRT Orange Line (planned)
  MRT Yellow Line (planned)
  MRT Brown Line (cancelled)
  MRT Pink Line (planned)
  SRT Dark Red Line (planned)
  SRT Light Red Line (under construction)

References

External links

Official sites

Unofficial sites

Downloads


Mass Rapid Transit (MRT)
Info
Locale Bangkok, Thailand
Transit type Rapid transit
Number of lines 1
Number of stations 18
Operation
Began operation 3 July 2004
Owner Mass Rapid Transit Authority of Thailand
Operator(s) Bangkok Metro PCL
Technical
System length 21 km (13.05 mi)
Route map
Bang Sue
Kamphaeng Phet
Chatuchak Park
Phahon Yothin
Lat Phrao
Ratchadaphisek
Sutthisan
Huai Khwang
Thailand Cultural Centre
Phra Ram 9
Phetchaburi
Sukhumvit
QSNCC
Khlong Toei
Lumphini
Si Lom
Sam Yan
Hua Lamphong

The Bangkok Metro, officially called the Mass Rapid Transit (MRT), is Bangkok's underground metro system. It was constructed under a concession concept. Mostly, all civil infrastructures were provided by government sector, Mass Rapid Transit Authority of Thailand (MRTA) and handed over to their concessionaire under 25-year concession agreement. Bangkok Metro Company Limited (BMCL) is only one private sector that won a biding of MRTA's concession contract for blue line. As MRTA's concessionaire, BMCL provides M&E equipments, including electrical train, signalling system, SCADA, communication, PSD, etc, for the subway project and fully operates & maintains the system. The MRT line is officially known in Thai as rotfaifah mahanakhon (รถไฟฟ้ามหานคร) or "metropolitan electric train", but it is more commonly called rotfai taidin (รถไฟใต้ดิน), literally, "underground train". The metro has a fleet of 19 trains and the 19th train has already released to service since October, 2007 after a major accident.

Besides the MRT, Bangkok also has an elevated rail system called BTS or less officially the Skytrain.

Contents

History


The construction of the first Bangkok Metro line, officially known as Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) – "Celebration of Royal Auspice" – or informally as the "Blue Line", began on 19 November, 1996. The project suffered multiple delays not only because of the 1997 economic crisis, but also due to challenging civil engineering works of constructing massive underground structures deep in the water-logged soil upon which the city is built.

The Blue Line was opened for a limited public trial over several weeks starting 13 April 2004. On 3 July 2004 the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit, who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after the initial rush ridership has settled down to around 180,000 riders daily — considerably lower than projections of over 400,000, despite fares being slashed in half from 12-38 baht to 10-15 baht per trip. From 2006 until 2008, fares ranged between 14-36 baht per trip. The fare was raised to 16-41 Baht on 1 January 2009.

Operation

The 21-kilometer, 18-station Blue line presently runs from Bang Sue to Hua Lamphong via Phra Ram 9 and has a carrying capacity of 40,000 people in each direction per hour. Similar to the Skytrain, the Metro uses trains supplied by Siemens which travel up to 80 km/h. Passengers can conveniently connect to the Skytrain at Si Lom, Sukhumvit and Chatuchak Park stations. The metro has a large depot in Huai Khwang district, which is located between Phra Ram 9 and Thailand Cultural Centre stations. Considering that Bangkok is a low-lying plain which is prone to flooding, all of the Metro's station entrances are raised about one metre above the ground level and are equipped with built-in floodgates in order to avoid water inundating the system. Lifts and ramps are found at all stations, providing easy access for passengers in wheelchairs. Stations have multiple passage ways (generally four) which allow passengers to connect to any corner of the adjacent surface intersection. Maps depicting the local area and exit points are posted on the walls on the way out. Due to safety considerations, platform screen doors are installed. Uniformed security personnel and security cameras are present at each and every platform.

19 three-car metro trains are used, of the Siemens Modular Metro type. Each metro train consists of two motor cars and a centre trailer car.[1]


The ticketing system uses the RFID contactless technology with round black tokens issued for single trips and contactless stored value cards for frequent travellers. In the near future, a joint ticketing system will be set up so that passengers can use a single ticket on the Metro as well as on the Skytrain. Multi-storey park & ride facilities are provided at Lat Phrao and Thailand Cultural Centre. Motorists who park their cars at these premises will be issued with additional contactless smartcards and they need to have them electronically stamped at their destination station.

Major accident record

)]] On 17 January 2005, just after 09:15, an empty train returning to the depot collided with a peak-hour train filled with passengers at the Thailand Cultural Centre station. 140 people were hurt, most of whom sustained only minor injuries, and the entire Metro network was shut down for two weeks.

After initial investigations, it was found that the empty train had run into problems before the accident, grinding to a halt on a curve leading to the depot. The driver applied its brake and was waiting to be towed to the maintenance centre close to Thailand Cultural Centre station.

A rescue train was attempting to connect to the stalled train when the driver was told to release the brake while coupling had not yet been successful. It was then that the empty train began to roll backwards at a speed of ten metres per second, before smashing into the other train, which was carrying passengers. Therefore, it was believed that the incident was caused by negligence but the doubt on the training to their operation staff is still under public question mark.[2] This accident also resulted in two damaged trains but the heavy damaged areas were limited in only two leading cars and colliding speed was suspected at near 60 km/hrs due to an appearance of damaged area. However, one train, which was configured from the repair of the minor-damaged cars, was already fitted for operation at the end of 2006 and the remaining one was still under heavy repair until mid of 2007 and it was released to service in October, 2007. The cost resulting from the accident might be a much higher figure than BMCL quoted, and it was expected to be at least 400 million baht, which was totally insured by a local insurance company and the accident was recorded as the most severe damage ever in any metro system in Thailand.

The Metro resumed full operation on 1 February 2005, and passenger numbers soon rose back to pre-crash levels, partly due to a temporary promotional fare scheme which allowed passengers to travel any distance on the MRT for only ten baht (~0.25 USD).

Underground malls

Passageways between exits have been setup as malls and are steadily opening, creating underground cities. This is ironic since food and drink is not allowed in stations.

List of stations

Blue Line

Code Station Name Transfer coordinates
Blue Line
Mahai Sawan
(Planned for southern extension) ?
Bang Sakae
(Planned for southern extension) ?
Tha Phra (Planned) Bangkok Metro Blue Line: Bang Khae Extension  (proposed)
Charan Sanit Wong 13
or Panit Thonburi
(Planned)
Yaek Fai Chai (Planned) Silom Line: Phran Nok Extension  (proposed)
Bang Khun Non (Planned) BMTA bus lines/taxi link to Taling Chan floating market
Bang Yi Khan
or Boromarajajonani
or Phra Pinklao
(Planned)
BMTA bus lines/taxi link to Southern Bus Terminal (Phuttha Monthon Sai 1)
Sirindhorn
or Krung Thonburi Bridge
(Planned)
Bangkok Metro Orange Line  (proposed)
Bang Phlat (Planned)
Bang O (Planned) For Yanhee Hospital
Bang Pho (Planned)
Tao Pun Bangkok Metro Purple Line  (proposed)
18
BAN
Bang Sue Terminal station
Bang Sue Junction Railway Station and Phahon Yothin Railway Station
SRT Dark Red Line  (proposed)
SRT Light Red Line  (proposed)
13°48′8.75″N 100°32′27.36″E / 13.8024306°N 100.5409333°E / 13.8024306; 100.5409333
17
KAM
Kamphaeng Phet For Chatuchak Weekend Market and MOF Farmers' Market 13°47′51.83″N 100°32′54.07″E / 13.7977306°N 100.5483528°E / 13.7977306; 100.5483528
16
CHA
Chatuchak Park Sukhumvit Line: Mo Chit with outdoor Park & Ride lot
BMTA bus lines/taxi link to Northern and Northeastern Bus Terminal (Morchit 2)
For Chatuchak Park
13°48′9.85″N 100°33′13.21″E / 13.8027361°N 100.5536694°E / 13.8027361; 100.5536694
15
PHA
Phahon Yothin For Central Plaza Lat Phrao, Union Mall and St. John's University 13°48′46.25″N 100°33′41.22″E / 13.8128472°N 100.56145°E / 13.8128472; 100.56145
14
LAT
Lat Phrao with Park & Ride facility and THAI's City Air Terminal with connections to Don Mueang International Airport (DMK) 13°48′23.21″N 100°34′22.54″E / 13.8064472°N 100.5729278°E / 13.8064472; 100.5729278
13
RAT
Ratchadaphisek For hotels and business offices along Ratchadaphisek Ring Road 13°47′56.58″N 100°34′28.37″E / 13.79905°N 100.5745472°E / 13.79905; 100.5745472
12
SUT
Sutthisan For Sutthisarn area (AKA Poor man Patpong) 13°47′24.12″N 100°34′27.02″E / 13.7900333°N 100.5741722°E / 13.7900333; 100.5741722
11
HUI
Huai Khwang For many massage and entertainment facilities, in Huai Khwang area 13°46′43.13″N 100°34′26.64″E / 13.7786472°N 100.5740667°E / 13.7786472; 100.5740667
10
CUL
Thailand Cultural Centre Bangkok Metro Orange Line  (proposed) with Park & Ride facility

About a 20-minute walk to the performing-arts venue at Thailand Cultural Centre, Siam Niramit; for Jusco, Carrefour and Robinson department stores, as well as the Esplanade Cineplex

13°45′58.11″N 100°34′12.75″E / 13.7661417°N 100.5702083°E / 13.7661417; 100.5702083
9
RAM
Phra Ram 9 For Fortune Town shopping center and IT mall at Phra Ram 9 Intersection 13°45′26.57″N 100°33′54.56″E / 13.7573806°N 100.5651556°E / 13.7573806; 100.5651556
8
PET
Phetchaburi Suvarnabhumi Airport Link: Bangkok City Air Terminal
SRT Light Red Line  (proposed)
Khlong Saen Saep Express Boat (Asok Pier)
13°44′56.90″N 100°33′48.20″E / 13.7491389°N 100.5633889°E / 13.7491389; 100.5633889
7
SUK
Sukhumvit Sukhumvit Line: Asok
Nearby Siam Society and Sukhumvit shopping area
13°44′15.36″N 100°33′40.91″E / 13.7376°N 100.5613639°E / 13.7376; 100.5613639
6
SIR
Queen Sirikit National Convention Center For the Stock Exchange of Thailand, QSNCC and Klong Toei Market area 13°43′23.04″N 100°33′36.36″E / 13.7230667°N 100.5601°E / 13.7230667; 100.5601
5
KHO
Khlong Toei For Bon Kai - Klong Toei area 13°43′20.57″N 100°33′14.26″E / 13.7223806°N 100.5539611°E / 13.7223806; 100.5539611
4
LUM
Lumphini For Suan Lum Night Bazaar and Lumphini Park (Suan Lumphini) and dropping point to Sathon and Wireless Road 13°43′32.07″N 100°32′45.10″E / 13.725575°N 100.5458611°E / 13.725575; 100.5458611
3
SIL
Silom Silom Line: Sala Daeng
For Lumphini Park, Chulalongkorn Hospital and Si Lom business area
13°43′45.44″N 100°32′15.21″E / 13.7292889°N 100.5375583°E / 13.7292889; 100.5375583
2
SAM
Sam Yan For Chulalongkorn University, Jamjuree Square edutainment complex center and Snake Farm of the Thai Red Cross 13°43′55.49″N 100°31′50.76″E / 13.7320806°N 100.5307667°E / 13.7320806; 100.5307667
1
HUA
Hua Lamphong Terminal station
Hua Lamphong Railway Station, with trains in all directions.
SRT Dark Red Line  (proposed)
13°44′14.17″N 100°31′4.05″E / 13.7372694°N 100.5177917°E / 13.7372694; 100.5177917
Wat Mangkon Kamalawat (Planned) For Yaowarat (Bangkok Chinatown)
Wang Burapha (Planned) Bangkok Metro Purple Line  (proposed)
For Wang Burapha and Phahurat shopping area
Sanam Chai
or Pak Khlong Talat
(Planned)
For Pak Khlong Talat flower market, Memorial Bridge (Saphan Phut Night Market), Wat Pho and Museum of Siam (National Discovery Museum)
Itsaraphap
or Bangkok Yai
(Planned)
For Wat Arun and Bangkok Yai Area
Tha Phra (Planned) Bangkok Metro Blue Line: Bang Sue-Tha Phra Extension  (proposed)
Bang Phai (Planned)
Bang Wa (Planned) Silom Line: Bang Wa Extension  (proposed)
Phetkasem 48 (Planned)
Phasi Charoen (Planned)
Bang Khae (Planned) For Bang Khae Market area
Lak Song (Planned) Terminal at Kanchanaphisek Road (Western Bangkok Ring Road) with park & ride facilities

Expansion plans

Blue Line
Info
System Bangkok Metro (MRT)
Status 18 stations built and extension of 21 stations is planned.
Locale Bangkok, Thailand
Termini Hua Lamphong
Bang Sue
Stations 18
Operation
Character Underground
Technical
Line length 21 km (13.05 mi)

Various expansion plans of the Metro have been proposed, but as of 2009, construction work has not started on any. It is planned that, eventually, the combined route distance of the Metro alone will total 91 km with 3 Metro lines covering all of the major areas of Bangkok. The Blue line, once completely extended, will form a lariat-shaped loop encircling the city.

The initial expansion plan can be summarised as follows:

  • Blue Line extension:
  1. Bang SueBang Phlat – Tha Phra (13 km)
  2. Hua Lamphong – Tha Phra – Bang Khae (14 km)

Other expansion plans for the metro include:

  • Yellow Line: Lat Phrao – Sri Nagarindra – Samut Prakan
  • Brown Line:Bang Kapi – Ramkamheang Road – Saen Saep (10 km)
  • Pink Line:Saen Saep – Ram-Inthra Rd. – Chaeng Watthana Road – Tiwanon-Ngamwongwan Road intersection. (35 km)

Note that these plans do not include the extension proposed for the Skytrain, SRT Lines and airport link which is under the control of State Railway Thailand. BMCL itself expects to be the operator for the extension project and other lines but the final decision is still dependent on MRTA (government sector).

See also

Bangkok Rapid Transit System
  BTS Sukhumvit Line
  BTS Silom Line
  MRT Blue Line
Airport Link (under construction)
  MRT Purple Line (under construction)
  MRT Orange Line (planned)
  SRT Dark Red Line (planned)
  SRT Light Red Line (under construction)
  MRT Yellow Line (planned)
  MRT Brown Line (planned)
  MRT Pink Line (planned)

References

External links

Official sites

Unofficial sites

Downloads








Got something to say? Make a comment.
Your name
Your email address
Message
Please enter the solution to case below
12+12=