The Full Wiki

More info on Bonnet Carré Spillway

Bonnet Carré Spillway: Wikis

Advertisements
  
  

Note: Many of our articles have direct quotes from sources you can cite, within the Wikipedia article! This article doesn't yet, but we're working on it! See more info or our list of citable articles.

Encyclopedia

From Wikipedia, the free encyclopedia

Opening of the Bonnet Carre' Spillway on 1997-03-17. The spillway was operational from March 17 to April 18, 1997 -- operating at a maximum flow of 243,000 cfs.
The Bonnet Carré Spillway on the Mississippi River. Lake Pontchartrain can be seen in the far distance, about 5.5 miles (8.9 km) away. View is to the east-northeast.
The opening to the Bonnet Carré Spillway on the Mississippi River. The huge Shell Norco refinery can be seen at the bottom of the picture. View is upriver to the west.

The Bonnet Carré Spillway is a flood control operation in the Lower Mississippi Valley. Located in St. Charles Parish, Louisiana - about 12 miles west of New Orleans - it allows floodwaters from the Mississippi River to flow into Lake Pontchartrain and thence into the Gulf of Mexico.

Contents

Overview

The Bonnet Carré Spillway consists of two basic components: a control structure along the east bank of the Mississippi River and a floodway that transfers the diverted flood waters to the lake.[1] The control structure is a mechanically controlled concrete weir which extends for over a mile and a half parallel to the river. When opened, a portion of the water from the Mississippi bypasses the New Orleans metropolitan area, resulting in the Mississippi being lower than it could have been and reducing the stress on the area's levees that line the river. Confined by guide levees, the floodway stretches nearly six miles to Lake Pontchartrain, with a design capacity of 250,000 cubic feet per second.[2] The spillway is crossed by U.S. 61 and Interstate 10.

The spillway was built in response to the Great Flood of 1927 that inundated much of the Mississippi River basin. It was first opened during the flood of 1937, and eight times thereafter through 2008 to lower river stages at New Orleans. The most recent opening began on April 11, 2008, when river levels in New Orleans approached the flood stage of 17 feet.[3]

The spillway is part of the United States Army Corps of Engineers' multi-state plan, called the Mississippi River and Tributaries Project (MR&T), providing flood protection for the alluvial valley between Cape Girardeau, Missouri and the mouth of the river near Venice, Louisiana. Due to the wide expanse of the project and the complex problems involved, the plan contains an array of features. The MR&T Project provides for levees to contain flood flows, floodways such as the Bonnet Carré to redirect excess flows away from the Mississippi and has other aspects such as channel improvement and river bank stabilization for efficient navigation and protection of the levee system. It also involves reservoirs and pumping plants for flood control drainage.[4]

2007 expansion

In 2007, extraction operations began on a 42-acre square section of spillway property. The 7,600-acre spillway, designed to siphon rising water out of the Mississippi River during flooding seasons, long has been a major source of sand and clay that is used in construction projects throughout the area. But in the post-Katrina era, clay extracted from the spillway will be crucial to raising the levees in St. Charles Parish and east Jefferson Parish.

Once the excavation is complete, the pits will be filled with water and stocked with bluegill, largemouth bass and other fish to enhance the area's secondary function: a recreational haven for boaters, hikers, hunters and fishers.

History of openings

Years when the spillway was opened, number of days it remained open, and peak number of bays opened[3][5][6]

  • 1937 48 days, 285 bays opened
  • 1945 57 days, all 350 bays opened
  • 1950 38 days, all 350 bays opened
  • 1973 75 days, all 350 bays opened
  • 1975 13 days, 225 bays opened
  • 1979 45 days, all 350 bays opened
  • 1983 35 days, all 350 bays opened
  • 1997 31 days, 298 bays opened
  • 2008 31 days, 160 bays opened

See also

Notes

  1. ^ http://www.mvn.usace.army.mil/pao/bcarre/bc3.gif Army Corp of Engineers: Bonnet Carré Spillway
  2. ^ http://www.mvn.usace.army.mil/pao/bcarre/bc6.jpg Army Corps of Engineers: Annotated aerial view of spillway
  3. ^ a b "Corps begins to close spillway". Baton Rouge Advocate. http://www.2theadvocate.com/news/18440594.html?showAll=y&c=y. Retrieved 2008-05-01.  
  4. ^ http://www.mvn.usace.army.mil/pao/bcarre/bc4.gif Army Corps of Engineers: Louisiana MR&T structures
  5. ^ Matt Scallan (11 April 2008). "Previous Spillway Openings". New Orleans Times-Picayune: A-1.  
  6. ^ "Corps Finishes Closing Bonnet Carre Spillway". WDSU/AP. http://www.wdsu.com/news/16200056/detail.html?rss=no&psp=news. Retrieved 2008-05-08.  

External links

Coordinates: 30°00′09″N 90°26′31″W / 30.002517°N 90.441824°W / 30.002517; -90.441824

PD-icon.svg This article incorporates public domain material from websites or documents of the United States Army Corps of Engineers.

Advertisements

Advertisements






Got something to say? Make a comment.
Your name
Your email address
Message