| 14th | Top frigate classes by country |
![]() HMS Apollo, 1976 |
|
| Class overview | |
|---|---|
| Name: | Leander |
| Operators: | |
| Preceded by: | Rothesay class frigate Salisbury class frigate Leopard class frigate Tribal class frigate |
| Succeeded by: | Type 21 frigate |
| In commission: | 1963 - early 1990's |
| Completed: | 26 |
| Active: | 3 |
| Lost: | 3 as artificial reefs and 2 as targets |
| Retired: | 23 |
| General characteristics | |
| Class and type: | Frigate |
| Displacement: |
2,500 tons (later 2,790 tons) standard |
| Length: | 113.4 m (372 ft) |
| Beam: | 13.1 m (43 ft) |
| Draught: | 4.5 m (14 ft 10 in) |
| Propulsion: | 2 Babcock & Wilcox oil fired boilers, geared steam turbines delivering 22,370 kW (30,000 shp) to two shafts. |
| Speed: | 27 knots |
| Range: | 7,400 km (4,600 miles) at 15 knots |
| Complement: | 260 |
| Sensors and processing systems: |
|
| Armament: |
|
| Aircraft carried: |
|
See Leander class cruiser for the two cruiser classes of the same name.
The Leander class, comprising twenty-six frigates, was among the most numerous and long-lived classes of frigate in the Royal Navy's modern history. The class was built in three batches between 1959 and 1973. It had an unusually high public profile, due to the popular and acclaimed Warship BBC television drama series.
The Leander design or derivatives of it were built for other navies:
Contents |
On 7 March 1960, the Civil Lord of the Admiralty C. Ian Orr-Ewing stated that the "Type 12 "Whitby" class anti-submarine frigates are proving particularly successful... and we have decided to exploit their good qualities in an improved and more versatile ship. This improved Type 12 will be known as the Leander class. The hull and steam turbine machinery will be substantially the same as for the Whitbys. The main new features planned are a long-range air warning radar, the Seacat anti-aircraft guided missile, improved anti-submarine detection equipment and a light-weight helicopter armed with homing torpedoes. We shall also introduce air conditioning and better living conditions."[1] The 1963 edition of Jane's Fighting Ships described it a "mainly anti-submarine but flexible and all purpose type".[2]
"The Leander class have the same hull and substantially the same steam turbine machinery as the Whitby class, but are a revised and advanced design and will fulfil a composite anti-submarine, anti-aircraft and air direction role. The 40mm guns will eventually be replaced by Seacat ship-to-air launchers. The ships are equipped with VDS (Variable Depth Sonar), formerly known as dipping asdic."[2]
| Pennant | Name | (a) Hull builder (b) Main machinery manufacturers |
Laid down | Launched | Accepted into service | Commissioned | Estimated building cost[3] | |
|---|---|---|---|---|---|---|---|---|
| First 10, Y-100 machinery [4] | ||||||||
| F109 | Leander | (a) & (b) Harland & Wolff Ltd, Belfast.[5] | 10 April 1959 [2] | 28 June 1961 [2] | March 1963 [5] | 27 March 1963 [2] | £4,630,000 [5] | |
| F104 | Dido | (a) & (b) Yarrow & Co Ltd, Glasgow.[6] | 2 December 1959 [2] | 22 December 1961 [2] | September 1963 [6] | 18 September 1963 [2] | £4,600,000 [6] | |
| F127 | Penelope | (a) Vickers-Armstrongs (Shipbuilders) Ltd, Newcastle (b) Vickers-Armstrongs (Engineers) Ltd, Barrow-in-Furness [6] |
14 March 1961 [2] | 17 August 1962 [2] | November 1963 [6] | 31 October 1963 [2] | £4,600,000 [6] | |
| F114 | Ajax | (a) & (b) Cammell Laird & Co (Shipbuilders and Engineers) Ltd, Birkenhead.[6] | 19 October 1959 [2] | 16 August 1962 [2] | December 1963 [6] | 10 December 1963 [2] | £4,800,000 [6] | |
| F10 | Aurora | (a) & (b) John Brown & Co Ltd, Clydebank[6][7] | 1 June 1961 [2] | 28 November 1962 [2] | April 1964 [7] | 9 April 1964 [4] | £4,650,000 [6][7] | |
| F18 | Galatea | (a) Swan, Hunter & Wigham Richardson Ltd,
Wallsend-on-Tyne (b) The Wallsend Slipway & Engineering Co Ltd, Wallsend-on-Tyne (steam turbines) (b) Parsons Marine Turbines Co Ltd, Wallsend-on-Tyne (gearing).[6][7] |
29 December 1961 [2] | 23 May 1963 [2] | April 1964 [7] | 25 April 1964 [4] | £4,500,000 [6][7] | |
| F15 | Euryalus | (a) Scotts Shipbuilding & Engineering Co
Ltd, Greenock (b) Scotts Shipbuilding & Engineering Co Ltd (steam turbines) (b) Fairfield Shipbuilding & Engineering Co Ltd, Glasgow (gearing).[7] |
2 November 1961 [2] | 6 June 1963 [2] | September 1964 [7] | 16 September 1964 [4] | £4,350,000 [7] | |
| F39 | Naiad | (a) Yarrow & Co Ltd, Glasgow (b) Yarrow & Co Ltd, Glasgow (steam turbines) (b) Parsons Marine Turbines Co Ltd, Wallsend-on-Tyne (gearing).[7] |
30 October 1962 [2] | 4 November 1963 [4] | March 1965 [7] | 15 March 1965 [4] | £4,750,000 [7] | |
| F38 | Arethusa | (a) JS White
& Co Ltd, Cowes, Isle of
Wight (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) Parsons Marine Turbines Co Ltd, Wallsend-on-Tyne (gearing).[8] |
7 September 1962 [9] | 5 November 1963 [4] | November 1965 [8] | 24 November 1965 [4] | £4,850,000 [8] | |
| F28 | Cleopatra | (a) HM
Dockyard, Devonport (b) Cammell Laird & Co (Shipbuilders & Engineers) Ltd, Birkenhead (turbines) (b) John Brown & Co Ltd, Clydebank (gearing).[8] |
19 June 1963 [4] | 25 March 1964 [4] | February 1966 [8] | 4 January 1966 [4] | £5,300,000 [8] | |
| Second 6, Y-136 machinery [4] | ||||||||
| F42 | Phoebe | (a) Alexander
Stephen & Sons Ltd, Linthouse, Glasgow (b) Alexander Stephen & Sons Ltd, Linthouse, Glasgow (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[10] |
3 June 1963 [4] | 8 July 1964 [4] | April 1966 [10] | 15 April 1966 [4] | £4,750,000 [10] | |
| F45 | Minerva | (a) Vickers Ltd, Shipbuilding Group,,
Newcastle (b) Alexander Stephen & Sons Ltd, Linthouse, Glasgow (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[10] |
26 July 1963 [2] | 19 December 1964 [4] | May 1966 [10] | 14 May 1966 [4] | £4,700,000 [10] | |
| F40 | Sirius | (a) HM
Dockyard, Portsmouth (b) JS White & Co Ltd, Cowes, Isle of Wight (turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[10] |
9 August 1963 [4] | 22 September 1964 [4] | June 1966 [10] | 15 June 1966 [4] | £5,600,000 [10] | |
| F52 | Juno | (a) JI Thornycroft Ltd,
Southampton (b) JI Thornycroft Ltd, Southampton (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing)[11] |
16 July 1964 [4] | 24 November 1965 [4] | July 1967 [11] | 18 July 1967 [4] | £5,020,000 [11] | |
| F56 | Argonaut | (a) Hawthorn Leslie, Hebburn (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[11] |
27 November 1964 [4] | 8 February 1966 [4] | September 1967 [11] | 17 August 1967 [4] | £5,000,000 [11] | |
| F47 | Danae | (a) HM Dockyard, Devonport (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) Fairfields (Glasgow) Ltd (gearing).[11] |
16 December 1964 [4] | 31 October 1965 [4] | October 1967 [11] | 7 September 1967 [4] | £5,720,000 [11] | |
| Broad-beamed Leander Y-160 machinery [4] | ||||||||
| F75 | Charybdis | (a) Harland & Wolff Ltd, Belfast (b) Vickers Ltd, Engineering Group, Barrow-in-Furness.[12] |
27 January 1967 [4] | 28 February 1968 [4] | June 1969 [12] | 2 June 1969 [4] | £6,330,000 [12] | |
| F58 | Hermione | (a) Yarrow & Co Ltd, Glasgow (b) Alex Stephen & Sons Ltd, Linthouse, Glasgow (steam turbines) (b) Vickers Ltd, Engineering Group, Barrow-in-Furness (gearing).[12] |
6 December 1965 [4] | 26 April 1967 [4] | July 1969 [12] | 11 July 1969 [4] | £6,400,000 [12] | |
| F60 | Jupiter | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) Vickers Ltd, Engineering Group, Barrow-in-Furness (gearing).[12] |
3 October 1966 [4] | 4 September 1967 [4] | August 1969 [12] | 9 August 1969 [4] | £6,100,000 [12] | |
| F69 | Bacchante | (a) Vickers Ltd, Shipbuilding Group, Newcastle (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) Vickers Ltd, Engineering Group, Barrow-in-Furness (gearing).[12] |
27 October 1966 [4] | 29 February 1968 [4] | October 1969 [12] | 17 October 1969 [4] | £6,200,000 [12] | |
| F57 | Andromeda | (a) HM Dockyard, Portsmouth (b) JS White & Co Ltd, Cowes, Isle of Wight (steam turbines) (b) David Brown & Co Ltd, Huddersfield (gearing).[13] |
25 May 1966 [4] | 24 May 1967 [4] | December 1969 [13] | 2 December 1968 [4] | £6,700,000 [13] | |
| F71 | Scylla | (a) HM Dockyard, Devonport (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[12] |
17 May 1967 [4] | 8 August 1968 [4] | February 1970 [12] | 12 February 1970 [4] | £6,600,000 [12] | |
| F12 | Achilles | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[14] |
1 December 1967 [4] | 21 November 1968 [4] | July 1970 [14] | 9 July 1970 [4] | £6,270,000 [14] | |
| F16 | Diomede | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[15] |
30 January 1968 [4] | 15 April 1969 [4] | April 1971 [15] | 2 April 1971 [4] | £5,980,000 [15] | |
| F70 | Apollo | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[16] |
1 May 1969 [4] | 15 October 1970 [4] | 10 June 1972 [16] | 28 May 1972 [4] | £6,573,000 [16] | |
| F72 | Ariadne | (a) Yarrow & Co Ltd, Glasgow (b) JS White & Co Ltd (turbines) (b) David Brown & Co Ltd (gearing).[16] |
1 November 1969 [4] | 10 September 1971 [4] | 10 February 1973 [16] | 10 February 1973 [4] | £6,576,000 [16] | |
Eight of the first ten Leanders were given the so-called "Batch 1" or "Ikara" conversion,[17] which gave them the Ikara anti-submarine warfare missile.[18]
| Pennant | Name | Commissioned | conversion | |||
|---|---|---|---|---|---|---|
| Place undertaken | Started | Completed | Cost[19] | |||
| Batch 1A | ||||||
| F109 | Leander | 27 March 1963 [2] | Devonport [20 ][17] | 8 June 1970 [20 ][21] | 12 January 1973 [17][18][20 ] | £7,587,000 [20 ] |
| F114 | Ajax | 10 December 1963 [2] | Devonport [17][20 ] | 19 October 1970 [20 ][21] | 7 February 1974 [17][18][20 ] | £8,269,000 [20 ] |
| F18 | Galatea | 25 April 1964 [4] | Devonport [17][20 ] | 4 October 1971 [20 ][21] | 6 September 1974 [17][18][20 ] | £9,217,000 [20 ] |
| Batch 1B | ||||||
| F10 | Aurora | 9 April 1964 [4] | Chatham [17][20 ] | 4 December 1974 [20 ][21] | 27 February 1976 [17][18][20 ] | £15,580,000 [20 ] |
| F39 | Naiad | 15 March 1965 [4] | Devonport [17][20 ] | 15 January 1973 [20 ][21] | 20 June 1975 [17][18][20 ] | £10,410,000 [20 ] |
| F15 | Euryalus | 16 September 1964 [4] | Devonport [17][20 ] | 7 May 1973 [20 ][21] | 12 March 1976 [17][18][20 ] | £12,127,000 [20 ] |
| F38 | Arethusa | 24 November 1965 [4] | Portsmouth [17][20 ] | 10 September 1973 [20 ][21] | 7 April 1977 [17][18] | £16,585,000 [20 ] |
| F104 | Dido | 18 September 1963 [2] | Devonport [17][20 ] | 7 July 1975 [20 ][21] | 27 October 1978 [17][18][20 ] | £23,006,000 [20 ] |
Two of the Leanders with Y-100 machinery, and five out of the six with Y-136 machinery, were given the so-called "Batch 2" or "Exocet" conversion.[22] This conversion gave them Exocet anti-shipping missiles, and the ability to operate the Lynx helicopter.[18]
| Pennant | Name | Commissioned | Exocet conversion | ||||
|---|---|---|---|---|---|---|---|
| Place undertaken | Started | Completion date | Cost ("Outturn")[19] |
||||
| Planned | Actual | ||||||
| Batch 2A | |||||||
| F28 | Cleopatra | 4 January 1966 [4] | Devonport [20 ][22] | 23 July 1973 [20 ][21] | 19 December 1975 [18][20 ][22] | £13,820,000 [20 ] | |
| F42 | Phoebe | 15 April 1966 [4] | Devonport [20 ][22] | 5 August 1974 [20 ][21] | 28 April 1977 [18][20 ][22] | £18,204,000 [20 ] | |
| F40 | Sirius | 15 June 1966 [4] | Devonport [20 ][22] | 10 March 1975 [21] | 10 February 1978 [18][20 ][22] | £21,598,000 [20 ] | |
| F45 | Minerva | 14 May 1966 [4] | Chatham [20 ][22] | 1 December 1975 [20 ][21] | 11 April 1979 [18][20 ][22] | £31,575,000 [20 ] | |
| Batch 2B | |||||||
| F56 | Argonaut | 17 August 1967 [4] | Devonport [20 ][22] | 23 February 1976 [20 ][21] | 28 March 1980 [18][20 ][22] | £30,262,000 [20 ] | |
| F47 | Danae | 7 September 1967 [4] | Devonport [20 ][22] | 1 August 1977 [20 ][21] | 8 April 1981 [18][20 ][22] | £39,279,000 [20 ] | |
| F127 | Penelope | 31 October 1963 [2] | Devonport [18][20 ][22] | 30 January 1978 [18][20 ][21] | November 1981 [18][20 ] | 15 January 1982 [20 ][22] | £47,687,000 [20 ] |
| F52 | Juno | 18 July 1967 [4] | Exocet conversion cancelled.[22] | ||||
Juno, commissioned 18 July 1967 was converted to serve as a navigational training ship.[20 ] Work at Rosyth[20 ] began in January 1982 and completed in February 1985.[23]
The Seawolf conversion gave the broad-beamed Leaders Exocet anti-shipping missiles, Seawolf anti-air missiles, Sonar 2016, and the ability to operate the Lynx helicopter.[18] Only five of the broad-beamed Leaders were converted to carry Seawolf. "Conversion of the remaining five was not undertaken on grounds of cost (£70 million for each refit) and, as a lesser consideration, to retain some ships for the NGS role."[24] (NGS stands for naval gunfire support.)
| Name (Pennant) | Commissioned | ||||||
|---|---|---|---|---|---|---|---|
| Place undertaken | Started | Completion date | Cost ("Outturn")[19] |
||||
| Planned | Actual | ||||||
| Andromeda F57 | 2 December 1968 [4] | Devonport [20 ][24] | 3 January 1978 [20 ][21][25] | 6 February 1981 [18][20 ][24] | £59,990,000 [20 ] | ||
| Charybdis F75 | 2 June 1969 [4] | Devonport [18][20 ][24] | 25 June 1979 [20 ][21][26 ] | June 1982 [26 ] | 16 July 1982 [20 ][24] | £61,581,000 [20 ] | |
| Jupiter F60 | 9 August 1969 [4] | Devonport [18][20 ][24] | 28 January 1980 [20 ][21][26 ] | July 1983 [26 ] | 14 October 1983 [20 ][24] | †£68,348,000 [20 ] | |
| Hermione F58 | 11 July 1969 [4] | Chatham/Devonport [18][20 ][27] | 14 January 1980 [20 ][21][26 ] | January 1983 [26 ] | 8 December 1983 [20 ][24] | †£79,692,000 [20 ] | |
| Scylla F71 | 12 February 1970 [4] | Devonport [18][20 ][24] | 10 November 1980 [20 ][21][26 ] | September 1983 [26 ] | December 1984 [24] | †£79,278,000 [20 ] | |
† = Latest estimate as at 14 December 1983.[20 ]
In 1981 the Admiralty said that intended to devote "substantial resources to improving the effectiveness of the sensors and anti-submarine weapons ... This includes the new passive towed array system that we hope to introduce into service next year."[28]
The former destroyer Matapan and the frigate Lowestoft were used for testing prototypes in 1978-81. [29] It was planned to install them on Rothesay conversions, but this was not possible due to industrial strikes.[29] Scheduling then made it easier to fit them on board four of the Batch II Leanders. "Compensation for the additional 70 tons of top weight included lowering the Exocet launchers. This interesting quartet was to have been followed by five Batch III Leanders, but the latter fell foul of the Nott cancellations. A fifth Leander, the Ikara-carrying HMS Arethusa, was fitted with a towed array in 1985, the year the towed-array trials ship Lowestoft was withdrawn from service."[29]
Admiral Sir Julian Oswald said to the Defence Committe in 1989, "in order to capitalise on the really very exciting and important development of towed arrays, we had to get them to sea as soon as we could. The only sensible, cost-effective option open to us was to take some relatively older ships - the Leanders - and convert them quickly to the towed array. We have done that with great success, and the peacetime patrols have achieved some remarkable results, but there has been a price to pay because of the age of those ships."[30]
In general, "as a ship gets older it tends to get noisier - the hull and also the propulsion system".[31] Admiral Sir Julian Oswald spoke "to counter the presumption that older ships get noisier. That is not necessarily true and it is not true, in my experience, in the case of the Leanders because understanding of ship generated noise is improving all the time and our techniques for countering it are improving - our noise monitoring and so on - so, despite the fact that these ships are getting older, they are in many cases managing to improve their performance with regard to ship noise."[32] Captain Geoffrey Biggs said "the Leanders are remarkably quiet in operation and our experience has been that they have made excellent towed-array platforms despite the rather short notice of actually getting the towed-array programme together to start with. They actually perform very well."[32]
Five ships were converted to use Waverley Type 2031Z towed array (passive search very low frequency). They were as follows:[33]
| Pennant | Name | Commissioned | Refit when towed array fitted | ||||
|---|---|---|---|---|---|---|---|
| Started | Completed | ||||||
| Batch 2A Exocet Leander (Batch 2TA) | |||||||
| F42 | Phoebe | 15 April 1966 [4] | February 1981 [34] | July 1982 [34] | |||
| F28 | Cleopatra | 4 January 1966 [4] | January 1982 [34] | April 1983 [34] | |||
| F56 | Argonaut | 17 August 1967 [4] | August 1982 [34] | November 1983 [34] | |||
| F40 | Sirius | 15 June 1966 [4] | April 1985 [34] | December 1985 [34] | |||
| Batch 1B Ikara Leander | |||||||
| F38 | Arethusa | 24 November 1965 [4] | May 1985 [34] | February 1986 [34] | |||
The ships performed excellently in RN service, with relatively low noise levels giving the 2031(I) towed sonar mounted during the 1970s a range of more than 100 miles, better than that of the more advanced 2031(Z) sonar when fitted in the Type 22 class. However, all Leanders in RN service were decommissioned by the early 1990s due to the ships' aging design and the high number of crew. HMS Scylla was sunk 27 March 2004 as an artificial reef off Cornwall, ten years after her decommissioning in 1994.
| Date | Running cost | What is included |
|---|---|---|
| 1972-73 | £250,000[35] | Average annual maintenance cost per vessel for Leander class frigates |
| 1980-81 | £6 million[36] | Average current cost for a normal refit of a Leander class frigate. |
| 1981-82 | £6.8 million [37] | Average annual running cost of Leander frigates at average 1981–82 prices and including associated aircraft costs but excluding the costs of major refits. |
| 1985-86 | £6.5 million[38] | The average cost of running and maintaining a Leander class frigate for one year. |
| 1987-88 | £3.8 million[39] | The average annual operating costs, at financial year 1987-88 prices of a Leander class frigate. These costs include personnel, fuel, spares and so on, and administrative support services, but exclude new construction, capital equipment, and refit-repair costs. |
Leander class frigates were also successfully exported to serve in the Royal New Zealand Navy and Chilean Navy; in the latter they were designated as the Condell class. Further Leander class frigates were built under licence in Australia as the River class for the Royal Australian Navy, India as the Nilgiri class and the Netherlands as the Van Speijk class. Royal Navy ships were sold to the navies of Chile, Ecuador, New Zealand (Bacchante becoming HMNZS Wellington and Dido becoming HMNZS Southland), India and Pakistan.
Some Leanders remain in service with foreign navies, remaining in service with Ecuador, India, Indonesia (former Van Speijk class). Pakistan decommissioned the last of its Leander class frigates, PNS Zulfiqar, in January 2007, [40]
HMNZS Canterbury, the last steam-turbine driven Leander class frigate in the Royal New Zealand Navy, was decommissioned in Auckland on 31 March 2005 after 33 years operational service. In 2006 it was announced that the ship was to be sunk as a dive attraction in the Bay of Islands, and this was carried out on 3 November, 2007 at Deep Water Cove.
| Pennant | Name | Commissioned | Major refits | Fate | ||||
|---|---|---|---|---|---|---|---|---|
| Batch 1 (Ikara conversion) | ||||||||
| F109 | Leander | 27 March 1963 [2] | Sunk as target 1989 | |||||
| F104 | Dido | 18 September 1963 [2] | To New Zealand as HMNZS Southland 1983, paid out 1995 and sold for scrap | |||||
| F114 | Ajax | 10 December 1963 [2] | Scrapped 1988 | |||||
| F10 | Aurora | 9 April 1964 [4] | Scrapped 1990 | |||||
| F18 | Galatea | 25 April 1964 [4] | Sunk as target 1988 | |||||
| F15 | Euryalus | 16 September 1964 [4] | Sold for scrap 1990 | |||||
| F39 | Naiad | 15 March 1965 [4] | Sunk as target 1990 | |||||
| F38 | Arethusa | 24 November 1965 [4] | Sunk as target 1991 | |||||
| Batch 2 (Exocet conversion) | ||||||||
| F127 | Penelope | 31 October 1963 [2] | To Ecuador 1991 as Presidente Eloy Alfaro. | |||||
| F28 | Cleopatra | 4 January 1966 [4] | Sold for scrap 1993 | |||||
| F42 | Phoebe | 15 April 1966 [4] | Sold for scrap 1992 | |||||
| F45 | Minerva | 14 May 1966 [4] | Sold for scrap 1993 | |||||
| F40 | Sirius | 15 June 1966 [4] | Sunk as target 1998 | |||||
| F56 | Argonaut | 17 August 1967 [4] | Sold for scrap 1995 | |||||
| F47 | Danae | 7 September 1967 [4] | To Ecuador 1991 as Morán Valverde.[41] She was decommissioned in 2008, and put up for sale in December 2009.[41] | |||||
| Batch 2 | ||||||||
| F52 | Juno | 18 July 1967 [4] | Sold for scrap 1994 | |||||
| Batch 3A / broad-beamed Leander (Sea Wolf conversion) | ||||||||
| F75 | Charybdis | 2 June 1969 [4] | Sunk as target 1993 | |||||
| F58 | Hermione | 11 July 1969 [4] | Sold for scrap 1997 | |||||
| F60 | Jupiter | 9 August 1969 [4] | Sold for scrap 1997 | |||||
| F57 | Andromeda | 2 December 1968 [4] | To India 1995 as Krishna | |||||
| F71 | Scylla | 12 February 1970 [4] | Sunk as artificial reef off Whitsand Bay 2004 | |||||
| Batch 3B / broad-beamed Leander | ||||||||
| F69 | Bacchante | 17 October 1969 [4] | To New Zealand 1982 as Wellington, sunk as artificial reef in Cook Strait 2005 | |||||
| F12 | Achilles | 9 July 1970 [4] | To Chile 1990 as Ministro Zenteno, sold out 2006 | |||||
| F16 | Diomede | 2 April 1971 [4] | Extensive refit between 1991 and 1993.[40] | To Pakistan 1988 as Shamsher (F 263), retired pre-2007 to salvage spare parts for F 262 PNS Zulfiqar.[42] | ||||
| F70 | Apollo | 28 May 1972 [4] | Extensive refit between 1991 and 1993.[40] | To Pakistan 1988 as Zulfiquar (F 262), retired from Pakistani service 4 January 2007.[40] | ||||
| F72 | Ariadne | 10 February 1973 [4] | To Chile 1992 as General Baquedano, sunk as target 2004 | |||||
| Danae | £5,720,000 (Defence Estimates) | £5,830,000 (Hansard 26 March 1969) |
| Juno | £5,020,000 (Defence Estimates) | £5,000,000 (Hansard 26 March 1969) |
| Argonaut | £5,000,000 (Defence Estimates) | £5,000,000 (Hansard 26 March 1969) |
| Leander | Dec 1972 (Marriott) | Jan 1973 (Hansard) |
| Ajax | Sep 1973 (Marriott) | Feb 1974 (Hansard) |
| Aurora | Mar 1976 (Marriott) | Feb 1976 (Hansard) |
| Naiad | Jul 1975 (Marriott) | Jun 1975 (Hansard) |
| Cleopatra | Nov 1975 (Marriott) | Dec 1975 (Hansard 6 July 1981) |
| Sirius | Oct 1977 (Marriott) | Feb 1978 (Hansard 6 July 1981) |
| Minerva | Mar 1979 (Marriott) | Apr 1979 (Hansard 6 July 1981) |
| Danae | Sep 1980 (Marriott) | Apr 1981 (Hansard 6 July 1981) |
| Penelope | Mar 1981 (Marriott) | 15 Jan 1982 (Hansard 14 Dec 1983) |
| Andromeda | December 1980 (Marriott) | February 1981 (Hansard 6 July 1981) |
| Charybdis | August 1982 (Marriott) | 16 July 1982 (Hansard 14 December 1983) |
| Hermione | June 1983 (Marriott) | 8 December 1983 (Hansard 14 December 1983) |
| Ship | Year completed refit (Marriott) |
Year fitted or started fitting (Friedman) |
Dates of refits 1979-87 (Hansard {14 Jul 1987}) |
||
|---|---|---|---|---|---|
| Phoebe | 1982 | Refit Feb 1981 - Jul 1982 |
Refit May 1986 - Feb 1987 |
||
| Argonaut | 1983 | Major refit Feb 1976 - Mar 1980 |
Refit Aug 1982 - Nov 1983 |
||
| Cleopatra | 1984 | 1980 | Refit Oct 1978 - May 1979 |
Refit Jan 1982 - Apr 1983 |
Refit Mar 1987 - unknown |
| Sirius | 1985 | Refit May 1981 - Jul 1982 |
Refit Apr 1985 - Dec 1985. |
||
| Arethusa | Not stated | 1985 | Refit May 1980 - Mar 1981 |
Comparator refit May 1985 - Feb 1986 |
|
|
||||||||||||||||||||||||||
The Leander class frigate or Type 12M is a type of ship that was used by the Royal Navy.
The class became well known through the Warship BBC television drama series.
|
|