|
Shichinohe-Towada Station
七戸十和田駅
|
|
![]() |
|
|---|---|
| Shichinohe-Towada Station under construction in June 2009 | |
| Location | |
| Prefecture | Aomori (See other stations in Aomori) |
| City | Shichinohe |
| History | |
| Year opened | 2010 |
| Rail services | |
| Operator(s) | JR East |
| Line(s) | Tōhoku Shinkansen |
Shichinohe-Towada Station (七戸十和田駅 Shichinohe-Towada-eki) is a railway station under construction in Shichinohe, Aomori, Japan on the Tohoku Shinkansen extension from Hachinohe to Shin-Aomori scheduled to open in December 2010.[1]
The new station will consist of two elevated side platforms serving two tracks, with no passing tracks. The platforms are 263 m long and capable of handling 10-car trains. A track maintenance depot is located north of the station, with the connecting turnouts covered by a large snow shelter.[2]
Construction of the new station started in August 2008, with completion scheduled for September 2009. Initially named provisionally as Shichinohe Station, the name of the new station was announced on 29 July 2009, to emphasize the station's role as a gateway to Lake Towada.[3]
|
|||||||||||
Coordinates: 40°43′11″N 141°09′16″E / 40.719726°N 141.154556°E
|
|