Sovetsky Soyuz class battleship: Wikis

Advertisements
  

Note: Many of our articles have direct quotes from sources you can cite, within the Wikipedia article! This article doesn't yet, but we're working on it! See more info or our list of citable articles.

Encyclopedia

From Wikipedia, the free encyclopedia

Side and plan views of a grey warship with two funnels and a cream-colored deck. The submerged portion of the hull is red.
Sovetsky Soyuz class side and plan views
Class overview
Operators:  Soviet Navy
Preceded by: Imperator Nikolai I
Succeeded by: None
Cost: 1,180,000,000 rubles
Built: 1938–41
Planned: 4
Cancelled: 4
General characteristics after 1941 modifications
Type: Battleship
Displacement: 59,150 metric tons (58,220 long tons) (standard)
65,150 metric tons (64,120 long tons) (full load)
Length: 269.4 m (884 ft)
Beam: 38.9 m (128 ft)
Draught: 10.4 m (34 ft)
Installed power: 201,000 shp (149,886 kW)
Propulsion: 3 shafts, Brown Boveri steam turbines
6 triangle-type boilers
Speed: 28 knots (32 mph; 52 km/h)
Endurance: 7,680 nmi (8,840 mi; 14,220 km) at 14 knots (16 mph; 26 km/h)
Armament:

3 × 3 - 406-millimeter (16.0 in) B-37 guns
6 × 2 - 152-millimeter (6.0 in) B-38 guns
6 × 2 - 100-millimeter (3.9 in) B-34 DP guns

10 × 4 - 37-millimeter (1.5 in) 61-K AA guns
Armor: Waterline belt: 180–420 mm (7.1–17 in)
Deck: 25–155 mm (0.98–6.1 in)
Turrets: 230–495 mm (9.1–19 in)
Barbettes: 425 mm (16.7 in)
Bulkheads: 75–365 mm (3–14 in)
Conning tower: 425 mm (16.7 in)
Aircraft carried: 4 KOR-2 flying boats;
2 catapults

The Sovetsky Soyuz-class battleships (Project 23, Russian: Советский Союз), also known as 'Stalin's Republics', were a class of battleships laid down by the Soviet Union in the late 1930s but never brought into service. Only four hulls had been laid down, of the sixteen originally planned, by July 1940, when the decision was made to cease laying down more ships of the class, as the Soviet Union shifted its resources to building its land forces in preparation for the imminent war. Construction of the ships actually built was plagued with difficulties as the Soviet shipbuilding and related industries was not really prepared to build such large ships. One ship, Sovetsky Belorussiya, was cancelled on 19 October 1940 after serious construction flaws were found. The construction of the ships that were laid down continued, but was suspended shortly after Nazi Germany invaded the Soviet Union in June 1941, and did not resume after the end of the war in 1945.

Contents

Design and development

Design work had begun in 1935 on new battleships and the Soviets had made extensive efforts in Italy and the United States to purchase either drawings or the ships themselves in the late 1930s.[1] They did get some sketch designs from Gio. Ansaldo & C. and Gibbs & Cox which proved useful with their own designs, but nothing more. The first Tactical-Technical Requirement (TTZ in Russian) for the large battleship design was issued in 21 February 1936, but proved to be too ambitious when it specified nine 460-millimeter (18 in) guns and a speed of 36 knots (41 mph; 67 km/h) on a displacement of 55,000 metric tons (54,000 long tons). The TTZ was revised in May 1936 by Admiral Vladimir Mitrofanovich Orlov, Commander of the Soviet Navy, reducing speed to 30 knots (35 mph; 56 km/h), weakening the secondary and anti-aircraft batteries. A few months later Admiral Orlov reduced the size of the battleship to 45,000 metric tons (44,000 long tons) and set the size of the main guns at 406 millimetres (16.0 in). Shortly afterward the Soviet Union signed the Anglo-Soviet Quantitative Naval Agreement of 1937 and agreed to follow the terms of the Second London Naval Treaty which limited battleships to a displacement of 35,000 tonnes (34,447 long tons), although they did add a proviso that allowed them to build ships of unlimited size to face the Imperial Japanese Navy if they notified the British. Yet another TTZ was approved by Orlov on 3 August for ship of 41,500 metric tons (40,800 long tons), possibly chosen as large a violation as they thought they could get away with, with an armament of nine 406-millimeter, twelve 152-millimeter (6.0 in), twelve 100-millimeter (3.9 in), forty 37-millimeter (1.5 in) guns a maximum armor thickness of 380 mm (15 in) and a speed of 30 knots.[2]

The design of KB-4, the surface ship design bureau of the Baltic Shipyard, was selected for further development although the lead designers were convinced that only a larger ship could fulfill the ambitious requirements. They did manage to get agreement on 22 November 1936 for a thickening of the deck armor that raised the displacement to about 47,000 metric tons (46,000 long tons). Design work continued on this basis and technical work was completed for a ship of 47,700 metric tons (46,900 long tons) in April 1937, but the designers continued to press their case for larger ship. The issue was resolved by Stalin at a meeting on 4 July when he agreed to increase it to about 56,000 metric tons (55,000 long tons). This forced the project to begin again.[3]

This proved to be an inauspicious time to redesign the ship as the Great Purge was spreading into the ranks of the military and related industries. The original deadline for completion of design work by 15 October was missed and an incomplete version was presented to the Navy's Shipbuilding Administration the next month. A number of details remained to be worked out, including the final design of the machinery plant, the 152-mm guns and the 100-mm gun mounts. In the meantime extensive, and expensive (27 million rubles were spent on experimental work on the design in 1938), testing was conducted of the ship's hull form, deck armor and torpedo protection. Over 100 models of the hull were tested in the experimental basin to find the best hull form and two one-tenth scale launches were built at Sevastopol to test the hull's maneuverability. An old steamship was fitted with a replica of the design's armor decks and tested against 500-kilogram (1,100 lb) bombs which proved that they would generally penetrate both the 40-millimeter (1.6 in) upper and 50-millimeter (2.0 in) middle decks before exploding on the armored deck. The main armor deck was raised one deck in consequence and a splinter deck added underneath it. The underwater protection system was tested on fifteen one-fifth scale models and two full-sized caissons. These tests proved that the torpedo belt system of multiple bulkheads was superior to the Pugliese system of a large tube filled with smaller sealed tubes, but it was too late to incorporate these test results into the design as construction was well underway by the time that they were completed in late 1939.[4]

A revised design was approved on 28 February 1938 and the first ship was to be laid down on 15 July, but even this was incomplete and would be revised later. Trials with the motor launches revealed that the hull's propulsive efficiency would be 1 knot (1.2 mph; 1.9 km/h) less than planned and this was accepted in the November 1938 revision as a maximum speed of 27.5 knots (31.6 mph; 50.9 km/h). However, a new design of propeller proved to be more efficient than estimated and would increase speed to 28 knots (32 mph; 52 km/h). Another change was the deletion of the centerline rudder when tests showed that the two wing rudders could not counteract its effects if it was jammed. After the weights were calculated the ship showed a substantial trim by the stern. So the two 100-mm turrets mounted on the quarterdeck were deleted, the height of the armor belt abreast the rear turret was lowered in a effort to reduce the trim. However, the 100-mm turrets were restored by a decision of the State Defense Committee in 14 January 1941. This also forced a revision of the aircraft arrangements as the aircraft catapult had to be removed from the centerline of the quarterdeck; two catapults were added to the sides of the quarterdeck instead.[5]

Advertisements

General characteristics

The Project 23 class ships, as Sovetsky Soyuz and her sisters were designated, were 269.4 meters (884 ft) long overall. They had a beam of 38.9 meters (128 ft) and at full load a draft of 10.4 meters (34 ft). As designed they displaced 59,150 metric tons (58,220 long tons) at standard load and 65,150 metric tons (64,120 LT; 71,820 ST) at full load, although it is likely that they would have completed overweight. Weight estimates made in 1940 show that they would have exceeded 60,000 metric tons (59,000 long tons) standard and 67,000 metric tons (66,000 long tons) at full load.[6]

The hull form was very full, especially abreast the forward magazine, where the beam was wide to provide depth for the torpedo protection system. Coupled with her relatively low length-to-beam ratio of 7.14:1 this meant that a lot of horsepower was necessary to achieve even modest speeds. Stalin's decision that the Project 23 ships would use three shafts instead of four increased the shaft loading and reduced propulsive efficiency, although it did shorten the length of the armored citadel and thus overall displacement. Metacentric height was designed at 3.4 meters (11 ft) and the tactical diameter was estimated at about 1,170 meters (3,840 ft).[7]

The Sovetsky Soyuz class ships were provided with aircraft facilities to handle two to four KOR-2 flying boats which would be launched by the two catapults mounted on the stern. Two hangers were built into the after end of the forecastle deck to house two of them and cranes were provided at the forward end of the quarterdeck to hoist them out of the water.[8]

Machinery

The machinery arrangement was unusual; working from fore to aft, the turbine compartments for the wing shafts were located immediately abaft the magazines for turret No. 2, separated by a narrow centerline compartment for various ship control stations as well as the main fire control post; then came No. 1 boiler room, then a short compartment, then No. 2 boiler room, followed by another short compartment, then the engine room for the center shaft's turbine flanked by turbo-generator compartments, and finally boiler room No. 3. Each boiler room contained two boilers. This unusual arrangement, somewhat reminiscent of Italian practice, provided good dispersal of the machinery spaces, but at the cost of very long runs for the wing shafts (ca. 105m); it also meant that the boilers in Nos. 1 and 2 boiler rooms had to be raised sufficiently for the wing propeller shafts to pass beneath them.[9]

The steam turbines, and a license to build them, were originally going to be ordered from Cammell Laird in the United Kingdom, but their £700,000 cost was more than the Soviets wanted to pay. Instead they bought them from Brown Boveri, using the technical information acquired from Cammell Laird in the process, for £400,000. Four single-reduction, impulse-reduction geared turbines were ordered from the Swiss firm, three to equip Sovetskaya Rossiya and one to serve as a pattern for the factory in Kharkiv that was to build the remainder. They produced a total of 201,000 shp (149,886 kW). Six triangle-type water-tube boilers powered the turbines with a working pressure of 37 kg/cm2 (3,628 kPa; 526 psi) and a temperature of 380 °C (716 °F).[10]

Maximum speed was estimated at 28 knots (32 mph; 52 km/h), using the revised propeller design, although forcing the machinery would yield an extra knot. The normal fuel oil capacity was 5,280 metric tons (5,200 long tons), which provided an estimated endurance of 6,300 nautical miles (11,670 km) at 14.5 knots (17 mph; 27 km/h) and 1,890 nmi (3,500 km) at full speed. Maximum fuel capacity was 6,440 metric tons (6,340 long tons) which gave a range of 7,680 nautical miles (14,220 km) at 14.5 knots (17 mph; 27 km/h) and 2,305 nmi (4,270 km) at full speed.[11]

Armament

The main armament consisted of three electrically powered MK-1 triple turrets, each with three 50-caliber 406-mm B-37 guns. The guns could be depressed to −2° and elevated to 45°. They had a fixed loading angle of 6° and their rate of fire varied with the time required to relay the gun. It ranged from 2.0 to 2.6 rounds per minute depending on the elevation.[7] The turrets could elevate at a rate of 6.2 degrees per second and traverse at 4.55 degrees per second. 100 rounds per gun were carried. The guns fired 1,108-kilogram (2,440 lb) projectiles at a muzzle velocity of 830 m/s (2,700 ft/s); this provided a maximum range of 45,600 meters (49,900 yd).[12]

The secondary armament consisted of twelve 57-caliber B-38 152-mm guns mounted in six dual MK-4 turrets. Their elevation limits were -5° to +45° with a fixed loading angle of 8°. Their rate of fire also varied with the elevation from 7.5 to 4.8 rounds per minute. They were provided with 170 rounds per gun.[13] The turrets could elevate at a rate of 13 degrees per second and traverse at 6 degrees per second. They had a maximum range of about 30,000 meters (33,000 yd) with a 55-kilogram (120 lb) shell at a muzzle velocity of 950 m/s (3,100 ft/s).[14]

Heavy anti-aircraft (AA) fire was provided by a dozen 56-caliber 100-mm B-34 dual-purpose guns in six twin MZ-14 turrets with 400 rounds per gun. The ships began construction with only four turrets, but two additional turrets were restored to the quarterdeck in January 1941. They could elevate to a maximum of 85° and depress to -8°.[13] They could traverse at a rate of 12° per second and elevate at 10° per second. They fired 15.6-kilogram (34 lb) high explosive shells at a muzzle velocity of 895 m/s (2,940 ft/s); this provided a maximum range of 22,241 meters (24,323 yd) against surface targets, but their maximum range against aerial targets was 9,895 meters (32,464 ft), the limit of their time fuse.[15]

Light AA defense was handled by ten quadruple, water-cooled, 46-K mounts fitted with 37 mm (1.5 in) 70-K guns with 1800 rounds per gun. Initially only eight mounts were planned when the ships began construction, but two more added later, probably in January 1941, one on each side of the forward superstructure. Each mount was fully enclosed to protect the crew from the muzzle blast of the larger guns and against splinters.[13] The guns fired .732-kilogram (1.61 lb) shells at a muzzle velocity of 880 m/s (2,900 ft/s). Their effective anti-aircraft range was 4,000 meters (13,000 ft).[16]

Fire control

Each main gun turret was given a DM-12 12-meter (39 ft) rangefinder for use in local control, but they were generally going to be controlled by one of three KDP-8 fire-control directors. These had two 8-meter (26 ft) stereoscopic rangefinders, one to track the target and the other to measure the range to the ship's own shell splashes. Two of these were protected by 20 mm (0.79 in) of armor and were mounted atop the rear superstructure and the tower-mast. The other was mounted on top of the conning tower and was protected by 50 mm (2.0 in) of armor. They used a TsAS-0 mechanical computer to generate firing solutions. Four KDP-4t-II directors, with two 4-meter (13 ft) rangefinders each, controlled the secondary armament. One pair was abreast of the tower-mast and the aft pair was on each side of the aft funnel. Three SPN-300 stabilized directors, each with a 4-meter rangefinder, controlled the heavy anti-aircraft guns. One was on each side of the forward funnel while the other was atop the rear superstructure.[17]

Armor

Soviet armor plate plants proved to be incapable of producing plates of cemented armor thicker than 230 mm (9.1 in) which forced the decision to replace cemented plates thicker than 200 mm (7.9 in) with face-hardened ones with less resistance in November 1940. The plants tended to compensate by making the thicker plates harder, but this often made them more brittle and large numbers did not pass the acceptance tests. This would have significantly reduced the level of protection enjoyed by the Sovetsky Soyuz class ships in combat.[18]

The Sovetsky Soyuz class ships devoted a total weight of 23,306 metric tons (22,938 long tons) to armor protection, a slightly greater weight than that of the larger Japanese Yamato-class battleship (23,262 metric tons (22,895 long tons)). Their armor was intended to resist 406-mm shells and 500-kg bombs, specifically shells fired from forward bearings between 35° and 50° from the centerline. The led to the very unusual situation where the armor belt thickened towards the bow to compensate for the narrowing of the ship abreast the forward magazines, hence less oblique impacts, which had to be compensated for by thicker armor. The belt was 148.4 meters (487 ft) long and covered 57% of the total waterline length. It was inclined 5° to increase its resistance to flat-trajectory shells. Over the machinery spaces it was 375 mm (14.8 in) thick and increased in steps until it was 420 mm (17 in) thick over the forward magazines. It was 380 mm (15 in) over the rear magazine. The belt armor was carried forward of the magazines at a thickness of 220 mm (8.7 in) and terminated in a steeply sloped (30°) transverse 285 mm (11.2 in) bulkhead that reduced to 250 mm (9.8 in) at the lower deck where it was continued down to the inner bottom by a 75-millimeter (3.0 in) bulkhead. Forward of this bulkhead was a 20 mm (0.79 in) splinter belt that continued all the way to the bow. The main armor belt dropped down to the main deck from the upper deck abreast of the aft turret to reduce weight. This 'step' was protected by 180-millimeter (7.1 in) plates. A 365-millimeter (14.4 in) transverse bulkhead separated the rear turret and the ship's sides. The main part of the armored citadel was closed off by a 230-mm forward bulkhead and a 180 mm (7.1 in) rear bulkhead, both of homogeneous armor. Splinter armor 25 mm (0.98 in) thick covered the upper portion of the citadel.[19]

The forecastle deck was 25 mm (0.98 in) thick while the upper deck was 155 mm (6.1 in) over the citadel. Below it, the 50 mm (2.0 in) middle deck acted as a splinter deck. The upper deck was 100 mm (3.9 in) thick above the 220-mm waterline belt extension. The bottom edge of the forward splinter belt met with a 65 mm (2.6 in) arched deck. Another arched deck of the same thickness covered the stern aft of the rear transverse bulkhead.[20]

The main gun turrets had faces 495 mm (19.5 in) thick with sides and roofs 230 mm (9.1 in) thick. 180-millimeter (7.1 in) thick plates protected the gun ports and 60-millimeter (2.4 in) bulkheads separated each gun. The barbettes were 425 mm (16.7 in) thick above the upper deck. The MK-4 turrets had 100-mm faces and 65-mm sides. Their barbettes were 100-mm in thickness, but reduced to 65-mm on their inboard sides. 100-mm of armor protected the faces, sides and backs of the MZ-14 turrets for the 100-mm guns, but their roofs and barbettes were 100-mm thick. The forward conning tower had walls 425 mm (16.7 in) thick while the rear conning tower had only 220 mm (8.7 in). The flag bridge in the tower-mast had 75 mm (3.0 in) of protection.[20]

The torpedo defense system was designed to withstand torpedoes with warheads equivalent to 750 kg (1,700 lb) of TNT. The ships were intended to be able to remain afloat with any five adjacent compartments flooded or with three torpedo hits and the unarmored above-water side destroyed. The Pugliese system protected 123 meters (404 ft) of the ships' midsection. At the aft end was a multi-bulkhead protection system that extended another 33 meters (108 ft) to the rear from the Pugliese system. The depth of the system was 8.2 meters (27 ft) amidships, but it reduced to 7 meters (23 ft) fore and aft. The outer plating ranged from 11 to 14 mm (0.43 to 0.55 in) in thickness while the inner bottom was 7 mm (0.28 in) thick. The cylinder of the Pugliese system was also 7 mm thick while the semi-circular main bulkhead was 35 mm (1.4 in) thick with a flat 10-millimeter (0.39 in) bulkhead behind it. The 3.15-meter (10.3 ft) diameter cylinder was intended to be immersed in fuel oil or water.[21]

Construction

The August 1938 shipbuilding plan envisioned a total of 15 Project 23 class battleships, even this grandiose scheme was only slightly revised downwards to 14 ships in the August 1939 plan. Eight of these were to be laid down before 1942 and the remaining six before 1947. However, only four were actually laid down before the outbreak of World War II forced the Soviets to reassess their ambitious plans. On 19 October 1940 they decided that no new battleships would be laid down as more resources were required for the Army.[22]

The Soviet shipbuilding and related industries proved to be incapable of supporting the construction of so many large ships at the same time. The largest warships built in the Soviet Union prior to 1938 were the 8,000-metric-ton (7,900 LT; 8,800 ST) Kirov-class cruisers and even they had suffered from a number of production problems, but the Soviet leadership preferred to ignore the industrial difficulties when making their plans. Construction of two more ships planned at Leningrad and Nikolayev had to changed to the brand-new Shipyard Nr. 402 in Molotovsk because the existing shipyards could not be expanded to handle so many large ships. Components for these two ships had to be manufactured at Leningrad and shipped via the White Sea – Baltic Canal to Molotovsk. Other problems were that the turret shop at Nikolaev proved to be too poorly equipped to assemble the 406-mm mountings, propeller shafts had to be ordered in 1940 from Germany and the Netherlands as the domestic plants were already overburdened with orders. Shipbuilding steel proved to be in short supply in 1940 and a number of batches were rejected because they did not meet specifications. Armor plate production was even more problematic as only 1,800 metric tons (1,800 LT; 2,000 ST) were delivered in 1939 of the anticipated 10,000 metric tons (9,800 LT; 11,000 ST) and more than half of that was rejected. Furthermore the armor plants proved to be incapable of making cemented plates over 230 millimeters (9.1 in) and inferior face-hardened plates had to substituted for all thicknesses over 200 millimeters (7.9 in).[23]

Machinery problems were likely to delay the ships well past their intended delivery dates of 1943–44. Three turbines were delivered by Brown Boveri in 1939 to Arkhangelsk for the Sovetskaya Rossiya, but the Kharkhovskii Turbogenerator Works never completed a single turbine before the German invasion in June 1941. A prototype boiler was supposed to have been built ashore for evaluation, but it was not completed until early 1941 to further complicate the production plan.[24]

Construction all three ships was ordered halted on 10 July 1941 and the Sovetsky Soyuz was placed into long-term conservation as the most advanced ship. However all three were officially stricken from the Navy List on 10 September 1941.[7]

Sovetsky Soyuz

Sovetsky Soyuz (Russian: Советский Союз Soviet Union) was formally laid down 15 July 1938 in Shipyard Nr. 189 (Ordzhonikidze) in Leningrad, although evidence suggests that the beginning of real construction began in January 1939 after her slipway was completed, the necessary cranes were in place and working drawings had been completed.[25] When the war began she was estimated to be 21.19% complete with 15,818 metric tons (15,568 LT; 17,436 ST) of steel assembled on the slip. She was only lightly damaged by German air attacks and bombardments and some material had been used during the Siege of Leningrad, she was estimated to be 19.5% complete after the end of the war. Some thought was given to completing her, but this was opposed as she was regarded as obsolete in light of the experience gained during the war. However Stalin's expressed desire to see one of the Project 23 class ships completed only delayed the decision to scrap her. It was ordered on 29 May 1948 and was well underway by April 1949.[26]

Sovetskaya Ukraina

Sovetskaya Ukraina (Russian: Советская Украина ("Soviet Ukraine")) was laid down 31 October 1938 at Shipyard Nr. 198 (Marti South) in Nikolayev. When the war began she was 17.98% complete with 13,001 metric tons (12,796 LT; 14,331 ST) assembled on the slipway. Some effort was made to launching the hull, but only work had been done to dredge the river at the foot of the slipway and she was captured on 18 August 1941, although retreating Soviet troops slightly damaged her hull. The Germans dismantled 200 feet (61 m) of her bow and 100 feet (30 m) of her stern for use. The Germans were forced to evacuate Nikolaev on 17 March 1944 and demolished the supporting blocks under her port side before they left which gave her a list between 5 and 10 degrees. She was ordered scrapped on 27 March 1947.[27]

Sovetskaya Rossiya

Sovetskaya Rossiya (Russian: Советская Россия Soviet Russia) was laid down on 22 July 1940 in Shipyard Nr. 402 in Molotovsk. After the end of the war she was only 0.97% complete with 2,125 metric tons (2,091 LT; 2,342 ST) of steel assembled. She was ordered scrapped on 27 March 1947.[27]

Sovetskaya Belorussiya

Sovetskaya Belorussiya (Russian: Советская Белоруссия Soviet Belorussia) was laid down 21 December 1939 at Shipyard Nr. 402 in Molotovsk, but construction was suspended in mid-1940 when it was discovered that 70,000 rivets used in her hull plating were of inferior quality. This fact likely influenced the decision to cancel her on 19 October 1940.[28]

References

  1. ^ McLaughlin, pp. 362–72
  2. ^ McLaughlin, pp. 380–82
  3. ^ McLaughlin, pp. 383–84
  4. ^ McLaughlin, pp. 384–85
  5. ^ McLaughlin, pp. 385–86, 389
  6. ^ McLaughlin, pp. 379, 386
  7. ^ a b c McLaughlin, p. 388
  8. ^ Gribovskii, p. 167
  9. ^ McLaughlin, Stephen (26 December 2005). Russian and Soviet Battleships: Errata, Corrections and Additions. p. 3. http://www.gwpda.org/naval/russian_and_soviet_battleships_errata.pdf. 
  10. ^ McLaughlin, pp. 393–94
  11. ^ McLaughlin, p. 380
  12. ^ "Russian 406 mm/50 (16") B-37 Pattern 1937". 9 October 2006. http://www.navweaps.com/Weapons/WNRussian_16-50_m1937.htm. Retrieved 3 January 2010. 
  13. ^ a b c McLaughlin, pp. 379, 389
  14. ^ "Russian 152 mm/57 (6") B-38 Pattern 1938". 23 May 2006. http://www.navweaps.com/Weapons/WNRussian_6-57_m1938.htm. Retrieved 3 January 2010. 
  15. ^ "Russia / USSR 100 mm/56 (3.9") B-34 Pattern 1940". 15 November 2008. http://www.navweaps.com/Weapons/WNRussian_39-56_m1940.htm. Retrieved 3 January 2010. 
  16. ^ "Russia / USSR 37 mm/67 (1.5") 70-K". 19 November 2008. http://www.navweaps.com/Weapons/WNRussian_37mm-67_70-K.htm. Retrieved 3 January 2010. 
  17. ^ McLaughlin, pp. 388–89
  18. ^ McLaughlin, p. 390
  19. ^ McLaughlin, pp. 190–92
  20. ^ a b McLaughlin, pp. 392–93
  21. ^ McLaughlin, p. 393
  22. ^ Rohwer and Monakov, pp. 95, 120
  23. ^ McLaughlin, pp. 386–87
  24. ^ McLaughlin, p. 387
  25. ^ Gribovskii, p. 166
  26. ^ McLaughlin, pp. 411–13
  27. ^ a b McLaughlin, pp. 379, 411, 413
  28. ^ McLaughlin, pp. 379, 387

Bibliography

  • Gribovskii, V. Iu. (1993). "The "Sovietskii Soiuz" Class Battleships". Warship International (Toledo, OH: International Naval Research Organization) 30 (2): 150–69. ISSN 0043-0374. 
  • McLaughlin, Stephen (2003). Russian & Soviet Battleships. Annapolis, MD: Naval Institute Press. ISBN 1-55750-481-4. 
  • Rohwer, Jürgen; Monakov, Mikhail S. (2001). Stalin's Ocean-Going Fleet. London: Frank Cass. ISBN 0-7146-4895-7. 

External links


Advertisements






Got something to say? Make a comment.
Your name
Your email address
Message