The Full Wiki

Stagecoach Supertram: Wikis

Advertisements

Note: Many of our articles have direct quotes from sources you can cite, within the Wikipedia article! This article doesn't yet, but we're working on it! See more info or our list of citable articles.

Encyclopedia

(Redirected to Supertram (Sheffield) article)

From Wikipedia, the free encyclopedia

Stagecoach Supertram
Stagecoachsupertramlogo.png
20091223 375 Supertram 114.jpg
Info
Locale Sheffield
Transit type Electrified tramway
Number of lines 3
Number of stations 48
Daily ridership 36,000 (2005/6)[1] - 13.15 million/year
Operation
Began operation 21 March 1994
Operator(s) Stagecoach Sheffield
Technical
System length 29 km/18 mi
Track gauge 1,435 mm (4 ft 8+12 in)
(standard gauge)

Supertram is a tram network in Sheffield, England. It is owned and operated in partnership between South Yorkshire Passenger Transport Executive (SYPTE), who own the infrastructure, and Stagecoach Group who operate and maintain the trams, through their Stagecoach Supertram branded subsidiary.

Following a parliamentary act in 1985 authorising the scheme, the system was built by SYPTE at a cost of £240 million,[2] and opened in stages between 1994 and 1995. It was initially operated by South Yorkshire Supertram Ltd (SYSL), a wholly owned subsidiary company of SYPTE. After lower than expected passenger revenue, SYSL was sold to Stagecoach for £1.15 million at the end of 1997. With the sale of SYSL, Stagecoach gained the concession to maintain and operate the Supertram trams until 2024.[3]

Launched in an initial light grey livery, following the takeover by Stagecoach the trams wore the Stagecoach corporate livery from 1997. From 2006 the trams were refurbished, and a new dedicated Supertram blue based livery was launched, rolled out by 2008.

Ticketing is integrated with the Stagecoach Sheffield bus operations, purchased by Stagecoach in 2005.

Contents

Description

Supertram at Castle Square.

It runs from Sheffield city centre northwest to Middlewood and Malin Bridge, via the University of Sheffield and Hillsborough; northeast to Meadowhall, via Attercliffe; and southeast to Halfway and Herdings Park, via Norfolk Park, Manor, and Gleadless. Construction started in 1991 and the first section to open was along former heavy rail alignment to Meadowhall on 21 March 1994,[3] shortly after the similar Metrolink scheme in Manchester.

The system consists of a mix of on-street running, reserved right-of-way and former railway alignment. The Middlewood line runs mainly on the street up to the City Centre; the Meadowhall line runs totally on reserved track - from Attercliffe to Meadowhall it runs on former railway line alongside a freight line to Tinsley Yard and the main line at Rotherham Central. The inner part of the Halfway and Herdings Park lines consist of on-street running, with the exception of the viaduct at Granville Road. The Herdings line then runs on reserved track, and the Halfway line crosses into Derbyshire and out again on reserved lines in the countryside. This line also serves Crystal Peaks Shopping Centre.

The three main City Centre stops are located on one side of a former dual carriageway, now a single lane and reserved for buses only.

Supertram and cycles

Supertram allows cyclists to carry folding bicycles if bagged. They have also in the past worked with CycleSheffield (formerly Sheffield Pedalpushers) in organising special trams for cycling days out. Currently, non-folding bicycles (with the exception of police bicycles), are not allowed on the tram at any time. CycleSheffield are continuing their efforts to permit the carrying of bicycles on the trams.

The on-road tram lines are hazardous for cyclists as they are both slippery (particularly when wet) and there is the possibility for cycle wheels to slip into the groove. Many cyclist accidents have been recorded. There is no signing to advise drivers of this hazard for cyclists.

Supertram has worked with CycleSheffield in addressing driver and cyclists behaviour to make the interface between trams and bicycles safer.

Liveries

The current livery.

The initial tram livery was overall light grey with a dark blue skirt,[4] and Supertram fleetnames. A minor modification appeared just prior to the Stagecoach Group rebranding, when the current motto, Supertram Sit Back and Relax, was added to the centre car in very large letters under the windows.

Following the Stagecoach takeover in 1997, the trams were rebranded into the corporate Stagecoach identity, a white base with three stripes, with a Stagecoach fleet name and SUPERTRAM strapline, in the style of their growing UK bus fleet. Later, as the bus fleets were given a new livery, a dark blue base was added under the orange, red and blue stripes. There was some suggestion that this was to stop the trams looking dirty, previously being white to bottom of the vehicle's body.

Between January 2006 and January 2009 the 25 strong fleet was refurbished internally as part of the 'refresh programme'. In parallel to this, the tram livery was rebranded to the current, specially designed scheme, a predominantly blue livery and more prominent SUPERTRAM image and a smaller subordinate Stagecoach identifier. This was loosely based on the blue version of the South West Trains corporate Stagecoach livery. Before and after images of the refresh are available on the Stagecoach Supertram website.[5] In May 2009 the second part of the refresh programme began, which was a major maintenance overhaul of the tram's under-floor running equipment. Expected to last until the end of 2012, this means that one tram is once again permanently unavailable for service, and the system therefore continues to operate with 23 trams out of an 'available for service' fleet of 24.[6]

In addition to the standard liveries, a number of all over advertising schemes have been used on individual trams for places such as the Meadowhall Centre,[7][8] a jobs website[9] and a holiday company.[10] June 2009 saw another advertising livery, when tram 120 was unveiled in a special advertising livery for East Midlands Trains, which is also part of the Stagecoach Group.

November 2009 saw a slight, albeit brief change to the tram liveries. For the first time in its history, Supertram publicly commemorated the annual Remembrance celebrations by putting large poppies on both ends of all it’s trams. The poppies first appeared on Saturday 7 November, the day before Remembrance Sunday. The move, which saw very little publicity, was very popular with the people of Sheffield.

Network

A map of the Supertram network. Diagram of the Supertram network

The Stagecoach Supertram network is organised around Park Square and comprises three lines. The lines, with termini at Meadowhall, Halfway and Hillsborough, all serve Sheffield city centre and meet at Park Square where a triangular junction was constructed to provide interchange between lines and operational flexibility. Two small branches serving Malin Bridge, from Hillsborough Interchange, and Herdings Park branch out from two of the main lines. The yellow line is extended north from Middlewood during the daytime to Stocksbridge by the SupertramLink bus.

Advertisements

Tram stop list

Yellow Line Blue Line Purple Line

Technical data

The track

Detail of the Supertram track at Park Square

The network is 29 km (18 miles) long, with 60 km of track.[11] It features two types of track; tramway track where either pedestrians or road traffic share the right of way and ballasted railway track when there are no such requirements. Tramway track consists of a grooved tramway rail set into a concrete base with troughs into which the rails are laid. Most of the track is on-street using 35G-section grooved tram rail, with BS11-80A 80 lb/yd flat-bottom rail elsewhere.[11] The railway track was supplied by British Steel Track Products of Workington and laid on sleepers consisting of concrete blocks with steel ties which gives a spring feeling when travelling on these sections. The track is laid on a bed of ballast which in turn rests on a prepared formation. Street crossings are usually laid with grooved tramway rails.

The overhead wiring

Supertram is powered through 12 electric substations and fed through 1.07 cm diameter overhead line equipment (OHLE) wire.[11] The substations convert the 11 kV AC supply into 750 V DC supply into the overhead. The 12 substations are situated as follows:

  • Blackburn Meadows
  • Carbrook
  • Nunnery Square
  • Park Square
  • Arbourthorne
  • Gleadless Townend
  • Birley
  • Crystal Peaks, Ochre Dyke Lane
  • Halfway, Eckington Way
  • University, Brook Hill
  • Langsett Road, Capel Street
  • Middlewood

The overhead line equipment depends on the location. If the tracks are close together, central poles with 'steady' arms on each side are used. If the tracks are further apart, poles on either side with span wire are used. With aesthetics in mind a minimum number of traction poles are used and whenever possible the wire is anchored onto neighbouring buildings. Supertram, Sheffield City Council and landlords were in talks to try and hide anchor points as much as possible and blend them into the structures.

The contact wires are twin cadmium copper ones, twin wires being necessary because of the high installed power rating of the trams (1 megawatt). The regenerative braking on the tram feeds current back into the wires.

Operation

The driving cab of a Stagecoach Supertram, heading towards Castle Square from Ponds Forge/Fitzalan Square.

The rules of operation of the Stagecoach Supertram are similar to those of a traditional railway. The system was operated by South Yorkshire Supertram Operating Company, who employed the staff and operated the depot and signalling and now by Stagecoach Supertram. Unlike normal trains, tramways can be operated without signalling, although block signalling is sometimes necessary on single-line sections. The trams are driven on a line-of-sight basis, so that the tram can be stopped if an obstruction is spotted ahead.

Signals, however, are used to give indications to tram drivers when running on-street and at street crossings. As trams have priority at many places, it was necessary to give them different traffic light phases from motor traffic and therefore different types of indication have to be used from those applicable to motor vehicles. Signal phases for the tramway are specifically modified to account for the length of the tram. The tram signals are usually operated alongside and in conjunction with traffic signals. Signals consist of white lights arranged vertically (for go), horizontally (for stop) and a cross (for caution). Two other light arrangement indicate a point direction at junctions. The five white lights are distinct from those of the standard road traffic lights or railway line-side signals.


Tramway signals

Junction signals

Points indicators are provided at junctions to indicate the route which is set through the points. At junctions, where Supertram and train movements can conflict with road traffic, fixed signals are provided in addition to points indicators. A points indicator may only be passed if it displays the correct route indication for the tram concerned and, where fixed signals are provided, if both points indicators and fixed signals are set for the correct route.

Line-side signals give instructions or warnings to tram drivers. To distinguish them from normal road signs, they are diamond-shaped. The most common are speed restrictions which are in miles per hour. These are particularly necessary on road-running where trams travel along with road traffic.

The route a tram is to take is computer-controlled. The route is set on a device in the tram before a journey is started, and on approach to junctions, a signal is sent from the tram to a device known as a VIS loop buried beneath the track. This automatically sets the points in the correct direction.

The depot

Tram on the permanent way leaving Sheffield station for Sheffield College on 5 July 2004

The depot is located at Nunnery Square and occupies the former main line carriage sidings alongside the Sheffield - Lincoln railway line. It was designed and constructed by Balfour Beatty on 2.6 hectares of land and consists of a three-line workshop building, 6 stabling sidings, a turning loop, engineers sidings and sundry equipment. The main offices and reception, supervisor's offices, plant room, staff mess rooms, paint shop, first aid are on the first floor level on the South side of the building. The Southwest of the building is home to the Operations and Power Controller's office, where live control of the running of the service is monitored using SCADA, CCTV and radio contact. The depot substation is also located in the southwest corner, two 600 kVA transformer-rectifiers supply the tramway overhead and a 800 kVA transformer feeds the depot facilities.

In the workshop itself are two through-running lines (numbered 8 and 9) and line 10, a stub end. All lines have inspection pits and line 8 possesses a Hegenscheidt wheel lathe. This machine allows wheel turning whilst both sets of doors are closed. The wheelsets are turned in situ. High level access is provided on lines 9 and 10 for servicing of equipment boxes and pantographs. An automated washing machine is located on line 7. The depot is currently in the process of refurbishing the entire fleet of 25 trams.

The site's security is of the highest importance and is provided by CCTV and fence guarding and is under control of security personnel housed in the operations centre. Road access is from Woodbourn Road at the end of the depot.

The site was, before the arrival of Supertram, already dedicated to the railway industry, Nunnery engine shed filled most of the site whilst lines of the Midland Railway, Great Central Railway and London and North Eastern Railway irrigated the area and served collieries.

Tramstops

48 tram stops have been built to permit users accessing the Supertram.[12] These are generally found to be 26.5 m in length and 3 m in depth and are of a network-wide standard making them easy to understand and use. The design incorporates recommendations made by the Cranfield Institute of Technology who studied ergonomics for both able-bodied and disabled users.[13]

Tram stops are elevated at 37.5 cm with a 1:20 slope. The platform edge comprises a 60 cm wide and light coloured textured paving with strips of 40 cm wide edge warning tactile strip. Directional guidance tactile paving crosses the width of the platform to coincide with the tram door locations.

Notable structures

The Supertram network possesses a few remarkable structures. Two viaducts and one underpass are of interest: the two viaducts carry Supertram onto Park Square (a major road junction in the centre of the city), one of them being a six-span viaduct, the other the bowstring steel arch Park Square Bridge. The underpass takes the tram underneath the busy A57 roundabout outside the University of Sheffield.

The fleet

On street running at the Middlewood terminus

The fleet of 25 trams were built by Siemens-Duewag of Düsseldorf, Germany in 1992. After undergoing trials on Düsseldorf's Rheinbahn system, the trams were delivered to Sheffield via the Rotterdam-Immingham cargo ship route. The trams are bi-directional and composed of three articulated carriages, with a 40% low-floor area. All four entrances are at 42 cm low level which matches the height of the platforms, ensuring level access. Both low-floor areas possess limited seating together with space for pushchairs and wheel chairs. The high area is 88 cm high and can be found at the outer-end of both end carriages and in the centre carriage, they are reached from either two or three steps.

Since Stagecoach Supertram possesses gradient as steep as 10%, all axles are powered, this limited the low floor area to in between the bogies. To maximise low floor area, the middle bogies were installed entirely below the centre carriage rather than under the articulation. The wheels are type Bochum 84 and have resilient rubber inserts and have a diameter of 67 cm that can be worn to a diameter of 59 cm.

Control is by d.c. chopper system with GTO semiconductors. Four longitudinal suspended monomotors which drive both axles in each bogie. Their power supply is 750 volts DC, collected from overhead lines using a pantograph. The trams' speed is controlled form the cab by a handheld "joystick" type controller which must be continually held in place to keep the track brakes off. No vigilance control, not even a task-linked system, is fitted, because of the perceived safety of the system of on-street running trams. Drivers are seated on sprung seats giving them additional comfort and a PA system allows them to communicate with passengers.

The vehicle interior has been designed to be both aesthetically pleasing and meet safety requirements. The interior fittings have no sharp edges to prevent any injury and are numerous as to give maximum holding possibilities. the interior lining for the ceiling consists of aluminium honeycomb bonded with melamine coloured resin. The lining is attached to suspension points welded to the roof section. The inside walls are made of coloured melamine material. The complete lining for the articulations consists of coloured fibre-glass reinforced plastic. The rear wall of the driving cab is made of laminated wood with a melamine veneer.

Passenger comfort is provided by 88 seats arranged face to face. The low floor areas possess minimum seating to provide space large enough to cater for wheelchairs in accordance with the requirements laid down by the DPTAC. Studies were completed by the Cranfield Institute of Technology to ensure all sections of the public retain full access to the facility.

Beginning in September 2005, the trams' manual destination boards were changed to multi-colour LED signs conforming with the Disability Discrimination Act 1995 (DDA). Also, the driver announced destination messages were replaced by recorded announcements. Three voices with local accents were chosen to record the destination messages on the three different tram lines.

Following the start of a refurbishment project in January 2006, the first of the refurbished trams was launched at the Nunnery Depot on 27 January 2006. The new livery is similar to the Stagecoach bus livery, but the doors are painted orange to conform with the DDA. Since the 3rd February 2009, all 25 of the trams have been refurbished.[14]

Ticketing

A South Yorkshire Supertram ticket.

Until the Stagecoach takeover, ticketing was done via ticket machines provided by Abberfield Technology of Australia. These blue ticket machines dispensed adult single ride tickets, senior citizen concessionary tickets, and child concessionary tickets. As well as singles, the machines sold multi-packs at a discount. Fare tables were shown on the machines with the validity of the different prices.

To travel, each ticket had to be validated in a yellow machine on the platform. The ticket defined the type of passenger and trip as tickets do now. On validation, an overprint was added, giving the tramstop code, time and date of validation and the point of validation.

As the machines did not dispense change, nearby shop-owners were often asked for change to purchase tickets from the machines. There were also problems with machine reliability. When Stagecoach took over South Yorkshire Supertram it removed the ticket machines and began selling tickets on board. This meant improved staff presence on board and tickets could be systematically checked.

Stagecoach Sheffield period tickets are valid on the trams and on Stagecoach buses, and period South Yorkshire PTE tickets covering Sheffield or the whole of South Yorkshire are valid on Supertram as well as buses and trains.

Unlike other tramway and light rail operators in the UK, Supertram accepts concessionary travel passes issued by any English local authority. [15]

Opening dates

  • 21 March 1994: Fitzalan Square to Meadowhall
  • 22 August 1994: Fitzalan Square to Spring Lane
  • 5 December 1994: Spring Lane to Gleadless Townend
  • 18 February 1995: Fitzalan Square to Cathedral
  • 17 February 1995: Cathedral to Shalesmoor
  • 27 March 1995: Gleadless Townend to Halfway
  • 3 April 1995: Gleadless Townend to Herdings Park
  • 23 October 1995: Shalesmoor to Middlewood/Malin Bridge

Future plans

Proposals were made to extend the network to Rotherham, Dore, Fulwood and Hellaby. However, a reduced scheme with extensions to Rotherham and Broomhill[16] failed to gain government funding in 2004.[17]

A new scheme has been announced to connect Supertram to Rotherham by way of electrifying an existing heavy rail line.[18]

See also

References

  1. ^ "Transport Statistics Bulletin" (PDF). Department for Transport. http://www.dft.gov.uk/162259/162469/221412/221535/224237/224260/publictransportstatisticsbul.pdf. Retrieved 2007-08-19.  
  2. ^ "Sheffield Supertram information". BBC South Yorkshire. BBC. http://www.bbc.co.uk/southyorkshire/content/articles/2005/10/06/sheffield_supertram_feature.shtml. Retrieved 2009-03-11.  
  3. ^ a b Courtenay, Peter. "Sheffield Supertram: History". TheTrams.co.uk. http://www.thetrams.co.uk/supertram/history.php. Retrieved 2007-08-19.  
  4. ^ Image gallery of the trams on launch week
  5. ^ http://www.supertram.com/refreshimages.html
  6. ^ http://www.supertram.com/latestfromsupertram_6755.html
  7. ^ Meadowhall liveried purple tram
  8. ^ Meadowhall liveried blue tram
  9. ^ [1]
  10. ^ Holiday company liveried tram
  11. ^ a b c "About us: Technical". Stagecoach Supertram website. http://www.supertram.com/technical.html. Retrieved 2007-08-19.  
  12. ^ Courtenay, Peter. "Sheffield Supertram: Facts and figures". http://www.thetrams.co.uk/factsnfigures.php?section=supertram. Retrieved 2007-08-19.  
  13. ^ "About us: Access". Stagecoach Supertram website. http://www.supertram.com/access.html. Retrieved 2007-08-19.  
  14. ^ "Stagecoach Supertram: Refresh Update". Stagecoach Group. http://www.supertram.com/latestfromsupertram_2379.html. Retrieved 2008-10-18.  
  15. ^ "Stagecoach Supertram Ticket Information". Stagecoach Group. http://www.supertram.com/ticketinformation.html. Retrieved 2010-01-04.  
  16. ^ [2]
  17. ^ "Bitter blow over plan for Supertram". Sheffield Star (Sheffield Newspapers Ltd). 7 July 2006. http://www.thestar.co.uk/template/ViewArticle.aspx?SectionID=58&articleid=1614642. Retrieved 2007-08-19.  
  18. ^ [3]

External links


Advertisements






Got something to say? Make a comment.
Your name
Your email address
Message